Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2.8 L
EMD Value
₹8,333
Closing Date
7 Oct 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
EDUDC2627100458-(CO KITCHEN SHED AT GOVT. MIDDLE SCHOOL WATIGAM) 05
2026_RDPR_326632_1
e- NIT No. 89 OF REWK/REGULAR-EDU/2026-27 Dated 30-09-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹8,333
16 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in trench excavation by mechanical means in foundations incl disposal -All Kinds of soils | 7.41 | cum | 256.85 | ₹1,903.26 |
| 2 | P/L of Stone soling tightly hand Packed 15 km lead and royality | 3.94 | cum | 900 | ₹3,546 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 graded stone Crushed aggregate 40mm nominal size | 1.81 | cum | 5,202.9 | ₹9,417.25 |
| 4 | Providing and laying in position 1:15:3 RCC of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:1.5:3 graded stone Crushed aggregate 20mm nominal size | 1.77 | cum | 7,788.4 | ₹13,785.47 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 Crushed aggregate 20mm nominal size | 4.45 | cum | 5,733.6 | ₹25,514.52 |
| 6 | plums | 1.11 | cum | 900 | ₹999 |
| 7 | Brick work with FPS Bricks of class designation 75 in superstructure in 1:6 morter including extra Brick work. | 7.29 | cum | 9,027.2 | ₹65,808.29 |
| 8 | Providing and Laying in position 1:1:5:3 RCC work in beams, suspended floors, roofs, lintels........... excluding the cost of centring and shuttering. | 2.83 | cum | 9,821.85 | ₹27,795.84 |
| 9 | Centering and Shuttring including Strutting ,Propping removal for foundation, footings, bases... Complete Job | 30.47 | sqm | 286.35 | ₹8,725.08 |
| 10 | Centering and Shuttering including Strutting ,Propping removal for Suspended Floors Beams Complete Job | 20.32 | sqm | 718.2 | ₹14,593.82 |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1104961.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .