| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 CrAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹18.8 Cr+₹14.0 L (0.75%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹19.1 Cr+₹42.8 L (2.30%)Rejected-Finance | L3 | Rejected-Finance Reject | |
| 4 | L4₹19.1 Cr+₹47.6 L (2.55%)Rejected-Finance | L4 | Rejected-Finance Reject | |
| 5 | L5₹20.2 Cr+₹1.5 Cr (8.13%)Rejected-Finance | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | JAY BALANAND CONSTRUCTION L4 | ARNI INFRA L2 | SHRI RAM CONSTRUCTION COMPANY L6 | RAJ CONSTRUCTION AND ENGINEERING SOLUTIONS L1 | NAVADIYA BROTHERS L3 | KESHAV KRUPA CONSTRUCTION PVT LTD. L5 | Central India Engineering Pvt. Ltd. L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Interception & Diversion of Nallahs with STP works Project of SIRONJ town under SBM 2.0 | ||||||||||
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 5.50 MLD and all appurtenant structures and allied works;
2. Construction of Rcc sump well along with providing and installing pumps and pumping main comprising of DIK7 class pipe of 250 - 300 mm diameter having length of 3885 m respectively from sump well to STP.
3. Providing & laying of 225 mm to 800 mm diameter pipe line comprising of RCC NP3 pipe having length of 8192 m for (Gravity Based) sewerage system including sewer appurtenances as required.
4. Construction of 16 Nos catch basin for interception & diversion of the waste water.
5. Construction of 17 Nos RCC Block for pipe support for Pumping Main at the distance of 5 m.
6. Construction of 3 Nos Interception Diversion Structure.
(I&D-1= L-22 m, H-1.5 m, FTL-3.425MLD)
(I&D-2= L-30 m, H-2.0 m, FTL-4.20 MLD)
(I&D-3= L-10 m, H-1.5 m, FTL-1.52 MLD)
7. Providing and laying of HT Feeder having the length of 2.50 kms. And Electrical 1 Nos. Substations.
8. Construction Stone Boulder Pitching of 2460m , Stone Toe Wall length of 1940 m & R.C.C Toe Wall length of 540m along the river.
9. For the Reuse Element construction of Rcc sump well along with providing and installing pumps and pumping main comprising of DIK7 class pipe of 250 mm diameter having length of 220 m respectively for water body. | 1 | Units | 19,13,49,880 ₹19,13,49,880 | 18,79,89,000 ₹18,79,89,000 | 20,32,99,000 ₹20,32,99,000 | 18,65,86,931.9 ₹18,65,86,931.9 Lowest | 19,08,71,505.3 ₹19,08,71,505.3 | 20,17,50,000 ₹20,17,50,000 | 20,38,29,220 ₹20,38,29,220 |
Tender Value
₹20.8 Cr
EMD Value
₹10.4 L
Closing Date
14 Apr 2025, 5:30 pmClosed
CMO
NAGAR PALIKA SIRONJ DIST VIDISHA
Interception and Diversion of Nallahs with STP works Project of SIRONJ town under SBM 2.0
2025_UAD_409083_1
626
Open Tender
Civil Works - Others
Lump-sum
365 days
SIRONJ
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
Yes
₹10.4 L
Yes
NAGAR PALIKA SIRONJ
16 Jan 2026
12 Mar 2025
16 Apr 2025
13 Mar 2025
14 Apr 2025
18 Mar 2025
17 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Interception & Diversion of Nallahs with STP works Project of SIRONJ town under SBM 2.0 | |||||
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 5.50 MLD and all appurtenant structures and allied works;
2. Construction of Rcc sump well along with providing and installing pumps and pumping main comprising of DIK7 class pipe of 250 - 300 mm diameter having length of 3885 m respectively from sump well to STP.
3. Providing & laying of 225 mm to 800 mm diameter pipe line comprising of RCC NP3 pipe having length of 8192 m for (Gravity Based) sewerage system including sewer appurtenances as required.
4. Construction of 16 Nos catch basin for interception & diversion of the waste water.
5. Construction of 17 Nos RCC Block for pipe support for Pumping Main at the distance of 5 m.
6. Construction of 3 Nos Interception Diversion Structure.
(I&D-1= L-22 m, H-1.5 m, FTL-3.425MLD)
(I&D-2= L-30 m, H-2.0 m, FTL-4.20 MLD)
(I&D-3= L-10 m, H-1.5 m, FTL-1.52 MLD)
7. Providing and laying of HT Feeder having the length of 2.50 kms. And Electrical 1 Nos. Substations.
8. Construction Stone Boulder Pitching of 2460m , Stone Toe Wall length of 1940 m & R.C.C Toe Wall length of 540m along the river.
9. For the Reuse Element construction of Rcc sump well along with providing and installing pumps and pumping main comprising of DIK7 class pipe of 250 mm diameter having length of 220 m respectively for water body. | - | Units | 20,79,89,000 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
165907485.xls
BOQ Document • 0.23 MB
165657323.html
Tender Document • 0.06 MB
165907486.pdf
Tender Document • 0.21 MB
SPECIFICATION.pdf
Tender Document • 1.54 MB
tenderdocuments.pdf
Tender Document • 1.55 MB
DPR.pdf
Tender Document • 18.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .