| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 CrAccepted-AOC | ₹7.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.3 Cr+₹14.6 L (2.04%)Rejected-AOC | ₹7.3 Cr+₹14.6 L (2.04%) | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not meeting the minimum eligibility criteria |
| 4 | Not Admitted-Fee/PreQual/Technical V P O DAHAR PANIPAT 132103 INDIA | PANIPAT | HARYANA | 132103 | - | - | Not Admitted-Fee/PreQual/Technical Others-Not meeting the minimum eligibility criteria |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not meeting the minimum eligibility criteria |
| Sl No | Description | Qty | Unit | ELEMENTE DESIGNER HOMES | PSP Dynamic Limited |
|---|---|---|---|---|---|
| 1.00HEAD A - DWELLING UNITS AND OTHER PROVISIONS | |||||
| 1.01 | Total cost of construction of Buildings (dwelling units and facility centre) including all associate facilities & services, fire-fighting, handicap ramp and staircase with stainless steel railing, mumty, plinth protection and other provisions complete in all respect as per scope of work with specifications and drawings mentioned in Bid document & including GST, Labour Cess, other Taxes and complete maintenance for 5 years. | 1 | L.S. | 6,25,00,000 ₹6,25,00,000 Lowest | 6,32,67,835 ₹6,32,67,835 |
| 2.00HEAD B - ON SITE INFRASTRUCTURE WORKS (on Item Rate Basis) including GST, Labour Cess and other Taxes | |||||
| 2.01SUB-HEAD 1 | |||||
| 2.02EARTH FILLING | |||||
| 2.03 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 1,275 | Cum | 8,28,750 ₹8,28,750 Lowest | 8,92,500 ₹8,92,500 |
| 2.04 | Extra for lead beyond 5 km (Rate Only) | 700 | Cum | 87,500 ₹87,500 | 12,600 ₹12,600 Lowest |
| 2.05 | Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth | 1,275 | Cum | 63,750 ₹63,750 | 15,300 ₹15,300 Lowest |
| 2.06 | Deduct for not watering the excavated earth for banking | 1,275 | Cum | 63,750 ₹63,750 | 10,200 ₹10,200 Lowest |
| 2.07 | Extra for Dewatering work (rate only) | 40 | Per Hour | 20,000 ₹20,000 | 19,200 ₹19,200 Lowest |
Tender Value
₹7.2 Cr
EMD Value
₹14.4 L
Closing Date
13 Apr 2026, 3:00 pmClosed
Executive Director
BMTPC, Core 5A, 1st Floor, India Habitat Centre, Lodhi Road, New Delhi 110003
Construction of Demonstration Housing Project for use as Social Purpose on Design and Build basis using Emerging technology including on site Infrastructure Works at Alwar, Rajasthan under PMAYU 2.0
2026_BMTPC_903113_1
BMT/S/2026/DHP-Rajasthan
Open Tender
Civil Works
Works
365 days
Arawali Vihar, Phase II
As per NIT
2 documents required · 2 mandatory
₹5,000
Yes
BMTPC
₹14.4 L
Yes
BMTPC Office
1 Jun 2026
20 Mar 2026
14 Apr 2026
20 Mar 2026
13 Apr 2026
7 Apr 2026
20 Mar 2026 - 6 Apr 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1HEAD A - DWELLING UNITS AND OTHER PROVISIONS | |||||
| 1.01 | Total cost of construction of Buildings (dwelling units and facility centre) including all associate facilities & services, fire-fighting, handicap ramp and staircase with stainless steel railing, mumty, plinth protection and other provisions complete in all respect as per scope of work with specifications and drawings mentioned in Bid document & including GST, Labour Cess, other Taxes and complete maintenance for 5 years. | - | L.S. | - | - |
| 2HEAD B - ON SITE INFRASTRUCTURE WORKS (on Item Rate Basis) including GST, Labour Cess and other Taxes | |||||
| 2.01 | SUB-HEAD 1 | - | - | - | - |
| 2.02 | EARTH FILLING | - | - | - | - |
| 2.03 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | Cum | - | - |
| 2.04 | Extra for lead beyond 5 km (Rate Only) | - | Cum | - | - |
| 2.05 | Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth | - | Cum | - | - |
| 2.06 | Deduct for not watering the excavated earth for banking | - | Cum | - | - |
| 2.07 | Extra for Dewatering work (rate only) | - | Per Hour | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.85 MB
BOQ_949281.xls
BOQ • 0.36 MB
Corrigendum02AlwarDateExtension13042026.pdf
PDF • 0.03 MB
Corrigendum01Alwar06042026.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .