| Sl No | Description | Qty | Unit | K.S.MANJU L1 |
|---|---|---|---|---|
| 1.00 | Clearing of Julifora Jungle with Uprooting with initial lead of 100 m including labour charges, complete etc. | 2,000 | Sq.m | 11 ₹22,000 Lowest |
| 2.00 | Engaging JCB and Tipper (10 tonnes ) for Clearing jugle, Levelling & Grading ,Cutting of excess earth and filling in low lying area and removal of boulders from site including the cost of transporting, fuel charges, hire charges, labour, lead, lift, etc., complete as directed by the Department Engineer at site. | 36 | Hrs | 1,600 ₹57,600 Lowest |
| 3.00 | Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. Hard gravelly soil | 983 | m³ | 140 ₹1,37,620 Lowest |
| 4.00 | Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. Soft disintegrated rock not requiring blasting | 140 | m³ | 200 ₹28,000 Lowest |
| 5.00 | Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. MR and DMR not requiring blasting | 140 | m³ | 300 ₹42,000 Lowest |
| 6.00 | Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. Hard rock (weding and chiselling) | 140 | m³ | 1,500 ₹2,10,000 Lowest |
| 7.00 | PCC 1:3:6 using 20 mm HBG metal for foundation without formwork but including cost of cement, materials, labour, lead, lift, consalidation using vibrators etc., complete. | 93 | m³ | 7,000 ₹6,51,000 Lowest |
| 8.00 | PCC 1:2:4 using 12 to 20 mm HBG metal for inside cable duct screed concrete with form work including cost of cement , materials, labour, lead, lift, curing, consolidation using vibrators etc., complete. | 6 | m³ | 13,000 ₹78,000 Lowest |
| 9.00 | Supply and filling the site with gravel with a lead of 25 Kms for proposed yard area, well rammed including filling charges as per standard specification (watering & consolidation) with all leads, lifts as per standard specification etc., complete. | 3,896 | m³ | 650 ₹25,32,400 Lowest |
| 10.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for , Equipment plinths, Retaining wall raft, Cable duct raft, tower foundation with formwork including cost of cement all materials, labour, lead, lift, curing, Consolidation etc. complete. (Excluding cost of steel reinforcement) | 515 | m³ | 12,000 ₹61,80,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.0 L
Closing Date
27 Dec 2022, 2:30 pmClosed
CE/TP -I/CHN
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Supply and erection of AH type 230 KV SS tower with its boom, VC type vertical Column for 230 KV SS with its boom, structure plinth, cable duct, metal spreading, gravel filling and allied civil works for One No 230 KV bay at existing Thiruvalam 400/
2022_EB_272200_1
TP1-122/2022-23
Open Tender
Civil Works
Works
120 days
THIRUVALAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.0 L
Yes
13 Jan 2023
13 Dec 2022
28 Dec 2022
13 Dec 2022
27 Dec 2022
13 Dec 2022
Amount
Clearing of Julifora Jungle with Uprooting with initial lead of 100 m including labour charges, complete etc.
Engaging JCB and Tipper (10 tonnes ) for Clearing jugle, Levelling & Grading ,Cutting of excess earth and filling in low lying area and removal of boulders from site including the cost of transporting, fuel charges, hire charges, labour, lead, lift, etc., complete as directed by the Department Engineer at site.
Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. Hard gravelly soil
Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. Soft disintegrated rock not requiring blasting
Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. MR and DMR not requiring blasting
Earth work excavation for tower, plinths and other structure foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete. Hard rock (weding and chiselling)
PCC 1:3:6 using 20 mm HBG metal for foundation without formwork but including cost of cement, materials, labour, lead, lift, consalidation using vibrators etc., complete.
PCC 1:2:4 using 12 to 20 mm HBG metal for inside cable duct screed concrete with form work including cost of cement , materials, labour, lead, lift, curing, consolidation using vibrators etc., complete.
Supply and filling the site with gravel with a lead of 25 Kms for proposed yard area, well rammed including filling charges as per standard specification (watering & consolidation) with all leads, lifts as per standard specification etc., complete.
RCC 1:1.5:3 using 12 to 20 mm HBG metal for , Equipment plinths, Retaining wall raft, Cable duct raft, tower foundation with formwork including cost of cement all materials, labour, lead, lift, curing, Consolidation etc. complete. (Excluding cost of steel reinforcement)
RCC 1:1.5:3 using 12 to 20 mm HBG metal for cable duct wall & Retaining wall with formwork including cost of cement all materials, labour, lead, lift, curing, Consolidation etc. complete. (Excluding cost of steel reinforcement)
Back filling of excavated pits of tower and other equipment foundation after completion of concreting, including watering and consolidation, labour etc., complete.
Supplying, fabricating in GI angle/flats for Cable duct wall as per drawing and specification including cost of MS angle ,Flats, galvanising ,placing in position , cost of all materials, transportation, labour, lead, lift etc complete as directed by the Engineer-in-charge at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Providing Anchor /Grip rod for foundation in the rock surface with drilling of 40 mm dia hole and fixing of 25 mm dia RTS rod 1.m length inside the hole and 1m length out side the hole with L shape bending for 25cm length including cost of all materials, labour, lead,lift, cost of approved grouting component etc complete as directed by engineer at site
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for Cable duct Cover Slab with form work including cost of cement and all lead, lift, curing by using curing tank, etc., complete as directed by the Engineer-in-charge at site. (Excluding cost of steel reinforcement)
Labour for Transporting, laying and fixing of RCC cover slab for Cable duct including loading and unloading from curing tank without any physical damages, cost of all labour, lead, lift etc., complete.etc., complete
Plastering with CM 1:3, 12 mm thick including cost of cement, all materials, labour etc., complete.
Colour washing two coats by using Santex matt paint over one coat primer of approved quality with suitable colour including cost of all materials, labour, lead, lift, curing etc., complete as directed by engineer at site.
Supplying and spreading of stone dust to finished thickness of 15 cm including cost of all materials, lead, lift, watering, cutting and levelling surface etc., complete as directed by engineer at site
Supplying and spreading of metal jelly of size 20 mm to a thickness of 15 cm including cost of all materials, lead, lift, watering, cutting and levelling surface etc., complete as directed by engineer at site
Labour charges for Fabrication and supply of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete as directed by the Engineer-in-charge at site.
Labour charges for Fabrication and supply of foundation bolts of 25mm and other various sizes and various lengths dia including providing cleat at bottom and threading at top and galvanizing the top of bolt including Double Nut and Washer, cost of all materials, labour lead lift etc., complete as directed by the Engineer-in-charge at site.
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete as directed by the Engineer incharge at site.
Providing Pvc pipes & fixing the pipes using couplers and bends, earth work and refilling and leak testing of fixed pipes including cost of all materials, labour, lead, lift etc. complete. 110 mm dia pipe with 6kg/sq.cm
Providing Pvc pipes & fixing the pipes using couplers and bends, earth work and refilling and leak testing of fixed pipes including cost of all materials, labour, lead, lift etc. complete. 50 mm dia pipe with 6kg/sq.cm
Providing Pvc pipes & fixing the pipes using couplers and bends, earth work and refilling and leak testing of fixed pipes including cost of all materials, labour, lead, lift etc. complete. 150 mm dia pipe with 4kg/sq.cm
Supply, transporting and fixing of 12mm bib cock including cost of all materials, labour, lead, lift etc. complete.
Supply, transporting and fixing of 20mm dia Gun metal gate value including cost of all materials, labour, lead, lift etc. complete.
Labour charges for Erection of towers including sorting out of tower members,unloading at site, tightening, punching the bolts and nuts, Patch painting, cutting of angles wherever necessary, final checking,including charges & rectification of tower parts if any , cost of all T&P, all lead, lifts , adhering to all safety norms, etc complete. As directed by the Engineer at site.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport and operator charges etc complete.
Supply , transporting and fixing of 100 mm dia GI pipes pipes using couplers and bends, earth work excavation , refilling and leak testing of fixed pipes for connecting transformer plinth to Oil collection sump including cost of all materials, labour, lead, lift etc. complete.
Fabrication, galvanisation and supply of standard tower parts ( AH type, VC type tower with its boom etc.,) as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745(Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arrangement for inspection of towers at purchase factory at his own cost)
Fabrication, galvanisation and supply, Transport of Bolts & Nuts to site including all taxes and duties, fright charges etc, complete. The governing standards for Bolts & Nuts should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arrangement for inspection of towers at purchase factory at his own cost)
Supply of RS JOIST 200X100 mm as per latest IS.
Supply of MS Channel 125X65 mm as per latest IS.
Supply of MS Angle 100X100X8 mm as per latest IS.
Supply of MS Angle 65X65X8 mm as per latest IS.
Supply of M.S Flat 75X12 mm as per latest IS.
Supply of MS Angle 65X65X6 mm as per latest IS.
Supply of M.S Flat 65X10 mm (Earthing ) as per latest IS.
Supply of MS Angle 50X50X6 mm as per latest IS.
Supply of M.S.Flat 50x8mm (Earthing) as per latest IS.
Supply of MS ROD 20mm as per latest IS.
Cutting and wastage charges
Labour for transporting of iron & steel from chennai with including loading & unloading charges (150 Kms)
Labour, machineries, consumables for fabrication of Heavy section without length wise welded joints (Sectional weight 14Kg/Mtr and above).
Labour, machineries, consumables for fabrication of Light section (sectional weight below 14Kg/Mtr)
Sand blasting with zinc painting
Labour of erection of heavy sections.(LC WORK)
Labour of erection of light sections.(LC WORK)
Labour charges for machineries, consumables for earthing and for the erection of earth mat, earth connection, earth electrode, consumables for earthing etc., as directed by the field engineer at site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .