Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -10.26% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹2.6 L (2.18%)Admitted-Finance | -8.30% | ₹1.2 Cr+₹2.6 L (2.18%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹35.5 L (30.4%)Admitted-Finance N I T NO EE M III WZ 2025 26 TC 72 | GURUGRAM | HARYANA | 122008 | +16.99% | ₹1.5 Cr+₹35.5 L (30.4%) | L3 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
21 May 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER SOUTHERN CC-2,DDA
SUPERINTENDING ENGINEER SOUTHERN CC-2,DDA
Recarpetting of road, repair of damaged footpaths, central verge etc. around Vikas Sadan, INA.
2026_DDA_908677_1
05/EE/SMD-IV/DDA/2026-27
Open Tender
Civil Works
Works
75 days
EE/SMD-IV/DDA/VIKAS SADAN INA NEW DELHI
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹2.6 L
4 Jun 2026
14 May 2026
22 May 2026
14 May 2026
21 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cold Milling of Asphaltic Surface/pavement (removal of BC/DBM or any asphaltic material from road surface/concrete surface) in thickness of 25 to 100mm so as to maintain surface below in shape, slope and undamaged workable to lay fresh layer of asphaltic material in line, level, size depth as directed by Engineer- incharge,including transportation and disposal of removed material from site for all lift and leads, cleaning of surface and making good asphalting work including local repair of damages/distress occurred after milling etc. complete as per method and machinery
prescribed in IRC and including selling of recycled RAP material and carriage of RAP upto a lead of 30 Km all included. | 613 | Cum | 1,305.9 | ₹8,00,516.7 |
| 2 | Providing and applying tack coat using hot straight run bitumen ofgrade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :
A)On W.B.M. @ 0.75 Kg / sqm | 2,453 | Sqm | 60.5 | ₹1,48,406.5 |
| 2.1 | B)On bituminous surface @ 0.50 Kg / sqm | 12,261 | Sqm | 48.2 | ₹5,90,980.2 |
| 3 | Providing and laying bituminous macadam using crushed stone aggregate of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.
A) 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix)
prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity | 184 | Cum | 8,505.65 | ₹15,65,039.6 |
| 4 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.
A)40/50 mm compacted thickness with bitumen of grade PMB- 40 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot
Mix Plant of 100-120 TPH capacity. | 613 | Cum | 11,204.1 | ₹68,68,113.3 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
A) 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived
from natural sources) | 46.4 | Cum | 7,878.5 | ₹3,65,562.4 |
| 6 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign
material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 589 | Sqm | 747.8 | ₹4,40,454.2 |
| 7 | Providing and fixing Glow studs of size 100x20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acryloretrite ) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge.
The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/- 5) degress to base .The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the Road surface using the adhesive conforming to IS, as per procedure
recommended by the manufacturer complete and as per direction of Engineer-in-charge. | 1,783 | Each | 206.3 | ₹3,67,832.9 |
| 8 | Dismantling stone slab flooring laid in cement mortar including
stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 194 | Sqm | 266.45 | ₹51,691.3 |
| 9 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre
lead as per direction of Engineer-in-Charge. | 387 | Metre | 39.35 | ₹15,228.45 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tender.pdf
Tender Documents • 1.58 MB
BOQ_955042.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .