Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.2 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹66.0 L+₹78,559 (1.20%)Rejected-AOC 94 PHASE II HOUSEING COLONY UDHAMPUR J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹67.0 L+₹1.7 L (2.67%)Rejected-AOC | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹67.0 L+₹1.8 L (2.70%)Rejected-AOC 1 181 KAMATCHI AMMAN KOVIL STREET KANNAN COLONY CHINTHAMANI MADURAI 625009 | MADURAI | MADURAI | TAMIL NADU | 625009 | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹72.1 L+₹6.9 L (10.6%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
Tender Value
₹70.5 L
EMD Value
₹1.3 L
Closing Date
22 Feb 2021, 6:00 pmClosed
SHRI AK DUBEY
Military Engineer Services, Commander Works Engineer, Udhampur, PO - Garhi, Udhampur-182121
CONSTRUCTION OF STORAGE SHED FOR BSO YARD (FOR GE NORTH AND GE SOUTH) UNDER GE (NORTH) UDHAMPUR
2020_MES_404891_1
CWE/U(N)-93/2020-21
Open Tender
Civil Works
Lump-sum
270 days
UDHAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE (NORTH) UDHAMPUR
₹1.3 L
Yes
19 Mar 2021
18 Dec 2020
24 Feb 2021
18 Dec 2020
22 Feb 2021
10 Feb 2021
Amount
BUILDING WORK (SCHEDULE 'A' PART-I) Lump sum price worked out by the Contractor for “Building Work” as listed in Schedule ‘A’ Part- I.
Internal Water Supply (SCHEDULE 'A' PART-II) Lump sum price worked out by the Contractor for “Internal Water Supply” as listed in Schedule ‘A’ Part- II .
INTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-III)(SEC-I) Lump sum price worked out by the Contractor for “Internal Electrification” as listed in Schedule ‘A’ Part- III (Sec-I)
INTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-III) (SEC-II) SCHEDULE `A' PART-III, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Slim linear LED lighting fixture 18/20 Watt LED Batten, with full base of extruded aluminium section acting as a heat sink with closed back, isolated driver, CRI ≥ 70, PF ≥ 0.9, Surge protection upto 2.0 kV, shatter proof opal sheet of polycarbonate diffuser with system efficacy ≥ 100 Lm/watt, operating voltage 170-240 volts, colour temp 6500K, Low heat generating LED (Make of LED shall be Cree/Nichia/Osram) complete making all connections using 1.5 Sqmm copper conductor multi strand PVC insulated 2 core flexible cable from ceiling rose to fitting complete all as per the directions of Engr-in-Charge. Note:- A certificate from the manufactures for warranty minimum upto 2 years shall be obtained and submitted to the AGE/GE.
Slim linear LED lighting fixture 10/12 Watt LED Batten, with full base of extruded aluminium section acting as a heat sink with closed back, isolated driver, CRI ≥ 70, PF ≥ 0.9, Surge protection upto 2.0 kV, shatter proof opal sheet of polycarbonate diffuser with system efficacy ≥ 100 Lm/watt, operating voltage 170-240 volts, colour temp 6500K, Low heat generating LED (Make of LED shall be Cree/Nichia/Osram) complete making all connections using 1.5 Sqmm copper conductor multi strand PVC insulated 2 core flexible cable from ceiling rose to fitting complete all as per the directions of Engr-in-Charge. Note:-A certificate from the manufactures for warranty minimum upto 2 years shall be obtained and submitted to the AGE/GE.
MCB SPN 6 to 40 Amps ( ISI Marked) 50 C/S 10 KA 'B' sereis complete all as specified.
MCB SP 5 to 32 Amps ( ISI Marked) 50 C/S 10 KA 'B' sereis complete all as specified.
MCB 63 Amps, TPN 415 volts, rupturing capacity 10 KA including providing aluminuium thimbles for outgoing cable,fixed in repairs, complete all as specified and as directed by Engr-in-Charge
Sub main wiring with two runs of 4 Sqmm ( 2x4 sqmm ) 1100 volts grade single core FRLS PVC insulated unsheathed multistranded copper conductor confirming to IS-694 drawn through and including non-metalic PVC rigid conduit 25 mm dia ISI marked with all conduit accessories mounting on suface of walls /roofs / ceiling etc with one run of 2.5 Sqmm (1x2.5sqmm ) single core FRLS PVC insulated unsheathed copper conductor cable as earth wire, fixed in repair, complete all as specified and directed by Engr-in-Charge. Note:- 2 runs of 4 Sqmm (2x4sqmm ) ,one run of 2.5 Sqmm (1x2.5 sqmm ) cable and one metre of conduit will be measured as one unit.
Exhaust fan AC single phase 230/240 V of size 300mm sweep with louver speed 900-950 RPM power input 50-55 W, Heavy duty, complete all as specified and as directed by Engr-in-Charge. Make : Crompton -EXHD300-6-1/Havells-Turbo force SP/Khaitan-HD Exhaust fan or equivalent makes given in PS.
Sub Total
PATH (SCHEDULE 'A' PART-IV) Lump sum price worked out by the Contractor for “PATH” as listed in Schedule ‘A’ Part- IV .
EXTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-V) Lump sum price worked out by the Contractor for “External electrification” as listed in Schedule ‘A’ Part- V .
EXTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-V) (SEC-II) SCHEDULE `A' PART-V, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Supply and fixing LED Street Light fitting 18/20 Watt, New generation energy saving & environmental friendly long life versatile pressure die-cast aluminium IP66 with acrylic, powder coated, pressure die cast aluminium compact high power LED tube light with heat resistant toughened Glass, Corrosion resistant, isolated driver low heat generating LED (Make of LED shall be CREE/Necia/Osram) including nuts, bolts, washers with suitable size/dia 40mm GI pipe bracket for fixing of street light including making all connection, complete all as per the direction of Engg-in-Charge. Note: A certificate from the manufactures for warranty minimum upto 2 years shall be obtained and submitted to the AGE/GE.
Sub Total
EXTERNAL WATER SUPPLY (SCHEDULE 'A' PART-VI) Lump sum price worked out by the Contractor for EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part- VI .
EXTERNAL WATER SUPPLY (SCHEDULE 'A' PART-VI) (SEC-II) SCHEDULE `A' PART-V, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Cutting and screwing existing steel tubing of 80 mm dia for alterations or additions, or lengthening screw on pipe to form connector, necessary done in position without taking down complete all as specified and as directed by Engr-in-Charge.
Construction of valve pit chamber of size i.e. 60 cm X 60 Cm X 60 Cm (internal dimmensions) including excavation& earth work of any type of soil, Brick work with sub class 'B' bricks in CM (1:6), 15mm thick internal plaster (1:6) and flush pointed as work proceed on external surface. M.S Cover made out of angle iron frame of angle iron 40mm X40mmX 6mm size including fixed with 3mm thick M.S Sheet including 2Nos handles and painted with 2-coat of synthetic enamel paint over one coat of red oxide primer, complete all as specified and as directed. all as per Drawing No. CEUZ/TD/1500/15 Sheet No. 1/1.
Sub Total
SEWAGE DISPOSAL (SCHEDULE 'A' PART-VII) Lump sum price worked out by the Contractor for “Sewage Disposal” as listed in Schedule ‘A’ Part- VII
SEWAGE DISPOSAL (SCHEDULE 'A' PART-VII) (SEC-II) SCHEDULE `A' PART-VII, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Construction of septic tank suitable for 10 users (single chamber) with inlet chamber, complete all as shown on drawings and specified.
Construction of soakage well of size 1.8m dia and 3.0 m effective depth with intercepting chamber, inlet pipe and screen chamber, complete all as shown on drawings and specified.
Sub Total
PROTECTIVE WORKS (SCHEDULE 'A' PART-VIII) Lump sum price worked out by the Contractor for “PROTECTIVE WORKS” as listed in Schedule ‘A’ Part- VIII .
AREA DRAINAGE (SCHEDULE 'A' PART-IX) Lump sum price worked out by the Contractor for “Area Drainage” as listed in Schedule ‘A’ Part- IX
EARTH WORK AND SITE CLEARANCE (SCHEDULE 'A' PART-X) Lump sum price worked out by the Contractor for “Earth work and site clearance” as listed in Schedule ‘A’ Part- X .
SHIVAE CONSTRUCTION
jyoti parkash sharma
R K BUILDERS
M/s R V Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .