| Sl No | Description | Qty | Unit | ARUN CONSTRUCTIONS L2 | RPS CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Desilting in the existing drain as per the direction of departmental officers etc. completed. | 105 | m³ | 110 ₹11,550 | 103 ₹10,815 Lowest |
| 2.00 | DISMANTLING Brick or stone in cement mortar walls under 3 mtr height | 25 | m³ | 285 ₹7,125 | 283 ₹7,075 Lowest |
| 3.00 | Dismantling the flooring concrete | 6 | m3 | 486 ₹2,913.57 Lowest | 486 ₹2,913.57 Lowest |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 15 | m³ | 5,310 ₹79,650 | 5,300 ₹79,500 Lowest |
| 5.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size
0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with 270.30 M2 support by casurina pullys 0.075 cm at 0.45 m lengthincluding cost of nails etc., Area. 10.80 sq.mtr (upto 4Feet) | 220 | m2 | 270 ₹59,400 Lowest | 270 ₹59,400 Lowest |
| 6.00 | Plain Cement Concrete 1:3:6 (one cement, three fine aggregates and six coarse aggregates) using 40mm size
ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and
labour charges etc., complete as per standard specification | 25 | m3 | 5,640 ₹1,41,000 | 5,630 ₹1,40,750 Lowest |
| 7.00 | Plastering in Cement Mortar 1:5 mix 12mm thick | 270 | m2 | 270 ₹72,900 Lowest | 270 ₹72,900 Lowest |
| 8.00 | Conveyance of Surplus earth from work site to City outer with average lead of 15 km | 136 | m3 | 165 ₹22,440 | 163 ₹22,168 Lowest |
| 9.00Add :- GST @ 18% | |||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
17 Mar 2025, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Reconstruction of damaged SWD at Tamilnadu Housing Board Phase I in ward no 02, North zone
2025_MAWS_529351_2
E5/NorthZone/2024-25
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
7 Aug 2025
3 Mar 2025
18 Mar 2025
3 Mar 2025
17 Mar 2025
3 Mar 2025
Amount
Desilting in the existing drain as per the direction of departmental officers etc. completed.
DISMANTLING Brick or stone in cement mortar walls under 3 mtr height
Dismantling the flooring concrete
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with 270.30 M2 support by casurina pullys 0.075 cm at 0.45 m lengthincluding cost of nails etc., Area. 10.80 sq.mtr (upto 4Feet)
Plain Cement Concrete 1:3:6 (one cement, three fine aggregates and six coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix 12mm thick
Conveyance of Surplus earth from work site to City outer with average lead of 15 km
Add :- GST @ 18%
ARUN CONSTRUCTIONS (BID ID -1271669)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_630318.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .