| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC AOC L1 |
| 2 | L2₹1.9 Cr+₹30.6 L (19.1%)Rejected-Finance 190 B BILANDPUR NEW COLONY NEAR PRATAP COACHING GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.9 Cr+₹30.6 L (19.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.1 Cr+₹54.0 L (33.7%)Rejected-Finance | ₹2.1 Cr+₹54.0 L (33.7%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.2 Cr+₹55.8 L (34.8%)Rejected-Finance PROP AJAY SINGH SIKARWAR VILLEGE POST AMAYAN TAHSIL MEHGAON DISTT BHIND M P 477227 | BHIND | MADHYA PRADESH | 477227 | ₹2.2 Cr+₹55.8 L (34.8%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per uploaded Result |
| Sl No | Description | Qty | Unit | M/S ABHAY ASSOCIATES L2 | MAA VAISHNO CONSTRUCTION COMPANY L4 | M/S RAM CHARAN YADAV L1 | BALENDRA SINGH L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work | 7,598.32 | cum | 90 ₹6,83,848.8 | 99 ₹7,52,233.68 | 51 ₹3,87,514.32 Lowest | 96.8 ₹7,35,517.38 |
| 2.00 | Earth in filling including cost of all materials, labour, T&P etc required for proper completion of work | 3,041.3 | cum | 150 ₹4,56,195 Lowest | 214 ₹6,50,838.2 | 151 ₹4,59,236.3 | 207.15 ₹6,30,011.38 |
| 3.00 | Centering & Shuttering for C.C work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. | 3,229.52 | Sqm | 150 ₹4,84,428 | 210 ₹6,78,199.2 | 100 ₹3,22,952 Lowest | 203.28 ₹6,56,496.83 |
| 4.00 | Laying C.C- A 40 M-10 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 20mm to 40mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 180 | cum | 11,100 ₹19,98,000 | 12,392 ₹22,30,560 | 9,000 ₹16,20,000 Lowest | 11,995.46 ₹21,59,182.08 |
| 5.00 | Laying C.C- A 20 M-15 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 300 | cum | 11,900 ₹35,70,000 | 13,500 ₹40,50,000 | 9,500 ₹28,50,000 Lowest | 12,640.14 ₹37,92,043.2 |
| 6.00 | Laying C.C- A 20 M-20 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 279.13 | cum | 12,200 ₹34,05,386 | 13,608 ₹37,98,401.04 | 9,800 ₹27,35,474 Lowest | 13,172.54 ₹36,76,852.21 |
| 7.00 | Making subgrade in lining work i/c watering, compaction and preparation of surface. | 4,920 | Sqm | 20 ₹98,400 | 20 ₹98,400 | 10 ₹49,200 Lowest | 19.36 ₹95,251.2 |
| 8.00 | S/Laying 100 mm thickness Local sand for filter base required for proper complection of work including cost of all materials, labour, T.&P.etc. | 482.16 | cum | 1,390 ₹6,70,202.4 | 1,550 ₹7,47,348 | 800 ₹3,85,728 Lowest | 1,474.26 ₹7,10,831.13 |
| 9.00 | Providing & Laying LDPE Sheet on slope below lining including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge . | 5,180.86 | Sqm | 40 ₹2,07,234.4 | 40 ₹2,07,234.4 | 20 ₹1,03,617.2 Lowest | 38.72 ₹2,00,602.9 |
| 10.00 | Plain Cement Concrete in M-20 (1:1.5:3) in Lining 100 mm Thickness with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 4,920 | Sqm | 1,310 ₹64,45,200 | 1,450 ₹71,34,000 | 1,300 ₹63,96,000 Lowest | 1,529.44 ₹75,24,844.8 |
Tender Value
Refer Docs
EMD Value
₹4.4 L
Closing Date
30 Sept 2025, 2:00 pmClosed
Superintending Engineer
S.E. Rapti Nahar Nirman Mandal-2, Basti (U.P.)
C. C. linning work of Rapti main canal from km. 122.800 to 123.200 in district Siddharth nagar
2025_UPIDC_1071582_2
Tender Notic 02/SE/2025-26
Open Tender
Civil Works
Item Wise
270 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,330
₹4.4 L
Yes
3 Dec 2025
9 Sept 2025
30 Sept 2025
9 Sept 2025
30 Sept 2025
9 Sept 2025
Amount
Earth work in excavation in foundation including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work
Earth in filling including cost of all materials, labour, T&P etc required for proper completion of work
Centering & Shuttering for C.C work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc.
Laying C.C- A 40 M-10 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 20mm to 40mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A 20 M-15 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A 20 M-20 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Making subgrade in lining work i/c watering, compaction and preparation of surface.
S/Laying 100 mm thickness Local sand for filter base required for proper complection of work including cost of all materials, labour, T.&P.etc.
Providing & Laying LDPE Sheet on slope below lining including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge .
Plain Cement Concrete in M-20 (1:1.5:3) in Lining 100 mm Thickness with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
PVC water stop seal 10mm thick for proper completion of work including cost of all material, labour, T&P etc
P/LPorous Concrete in panel with Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Joint filling with sealling compound materials properly in grooves i/c cost of all labour , T&P and material.
M/S ABHAY ASSOCIATES (BID ID -5573081)
BALENDRA SINGH (BID ID -5574066)
MAA VAISHNO CONSTRUCTION COMPANY (BID ID -5573306)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .