| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.4 LAccepted-Finance | 1 | Accepted-Finance Found in order | |
| 2 | 2₹6.5 L+₹9,150 (1.43%)Accepted-Finance | 2 | Accepted-Finance Found in order | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-GST is not active and suspended with effect from 08/08/2023. Hence not accepted. | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-GST is not active and Cancelled suo-moto with effect from 29/01/2020. Hence not accepted. |
Tender Value
₹7.5 L
EMD Value
₹14,953
Closing Date
19 Oct 2023, 11:00 amClosed
DFO(WL), Mayabunder
DFO(WL), Mayabunder
Construction of CC Road from ATR to Type-III quarter for the length of 75 mtr at Kalara under Kalara (WL) Range, WL Division, Mayabunder
2023_DCFWM_11572_2
WL-2/GS-224/551
Open Tender
Civil Works - Roads
Works
90 days
Kalara
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹14,953
3 Nov 2023
12 Oct 2023
20 Oct 2023
12 Oct 2023
19 Oct 2023
12 Oct 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of Soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
20% of excavated earth
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns
12 mm cement plaster of mix
1:4 (1 cement: 4 coarse sand)
RANJIT BAROI
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .