| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Vidyadharan Krishnan Nair L1 |
|---|---|---|---|---|
| 1.00Civil works | ||||
| 1.01 | Loading & unloading of 9 m psc and squre pole | 1 | Each | 600 ₹600 |
| 2.01 | Transporting of 9m psc and squre pole from Road side to pole pit up to 2 KM | 1 | Each | 800 ₹800 |
| 3.01 | Excavation of pole pit in Rocky ground 9 m psc pole | 1 | Per Pit | 1,000 ₹1,000 |
| 4.01 | Erection of 9 m,PSC pole | 1 | Per pole | 800 ₹800 |
| 5.01 | Loading & unloading of 8 m psc pole | 1 | Each | 400 ₹400 |
| 6.01 | Transporting of 8m psc and squre pole from Road side to pole pit up to 2 KM | 1 | Each | 600 ₹600 |
| 7.01 | Excavation of pole pit in Rocky ground 8 m Psc and Rcc pole | 1 | Per Pit | 750 ₹750 |
| 8.01 | Erection of 8 m,PSC pole | 1 | Per pole | 550 ₹550 |
| 9.01 | Fixing of 3Q X arm | 7 | Each | 1,400 ₹1,400 |
Tender Value
Refer Docs
EMD Value
₹2,993
Closing Date
13 Jan 2026, 2:00 pmClosed
EE/D/KZI
EE/D/KZI
EE/D/KZI/ETW-47/25-26/2912.25
2026_EB_638566_1
EE/D/KZI/ETW-47/25-26/29.12.25
Open Tender
Electrical Works
120 days
EE/D/KZI
As per Spec
3 documents required · 3 mandatory
₹0
₹2,993
Yes
26 Feb 2026
2 Jan 2026
14 Jan 2026
2 Jan 2026
13 Jan 2026
2 Jan 2026
2 Jan 2026 - 13 Jan 2026
Loading & unloading of 9 m psc and squre pole
Transporting of 9m psc and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 9 m psc pole
Erection of 9 m,PSC pole
Loading & unloading of 8 m psc pole
Transporting of 8m psc and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 8 m Psc and Rcc pole
Erection of 8 m,PSC pole
Fixing of 3Q X arm
Fixing of SQ X arm
Fixing of 3.5 V X arm & 5.5 TapChannel X arm
Fixing of HT/LT 'TI' Fittings
Dismantling & Re-Fixing of 3Q Xarm
Dismantling & Re-Fixing of SQ X arm
Dismantling & Re-Fixing of 3.5, V X arm & 5.5 TapChannel X arm
Dismantling & Re-Fixing of Gaurding X arm
Fixing of HT Pin Insulater
Fixing of LT Pin Insulater
Fixing of HT Disc Insulater
Fixing of LT shackle
Fixing of Aluminium knob
Dismantling & Re Fixing of HT Pin Insulater
Dismantling & Re Fixing of LT shackle
Dismantling & Re Fixing of Aluminium knob
Dis & Redoing of S phase connection
Dis & Redoing of 3 phase connection
Fixing of street light switching point arrangement
Excavation of stay pit on rocky ground
Erection of stay set complete
Dismantling and re Erection of stay set complete )
Stringing of HT line 7/4.09 ACSR mm pin point
Stringing of HT line 7/4.09 ACSR mm cut point
Stringing of LT line 7/3.15 AAAC or 7/3.35 ACSR pin point
Stringing of LT line7/3.15 AAAC or 7/3.35 ACSR cut point
Dismantling & re Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR pin point
Dismantling & re Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR cut point
Dismantling & re Stringing of HT line 7/4.09 ACSR mm cut point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR pin point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR cut point
Dismantling & re Stringing of LT line7/3.15 AAAC or 7/3.35 ACSR cut point
Dismantling of conductor up to 7/2.59 mm
Erection of 11 KV single pole Structere set including erection of square pole, Bed Channel, AB switch,H.G. Fuse, Feeder arrangements with open type fuse unit ,HT-LAS ,LT-LAS ,HT jumpering complete, LT Bus arrangement, Danger board, Structure earthing complete with 3 pits and earth loops & And pole concreteing complete without center support
Erection of Dis Tr Double pole Str complete as per TNEB standard includinge Bed Channel, Belting Angle, AB switch,H.G. Fuse, Feeder arrangements with open type fuse unit for 2 feeders,HT-LAS ,LT-LAS ,HT jumpering complete, LT Bus arrangement, insulator angle and erection of 3 Nos. Pin insulator, Danger board, Structure earthing complete with 3 pits and earth loops and 2 Nos PSC of pole and Etc..
Loadind & un loading of Distribution Transformer below 200KVA
Transporting of Distribution Transformer below 200 KVA
Erection of Distribution Transformer upto 200 KVA
Loadind & un loading of Distribution Transformer 250KVA
Transporting of Distribution Transformer 250 KVA
Erection of Distribution Transformer 250 KVA
Dismantiling & Re Providing of Jumpering
Loading & unloading of line materials
Transporting line materials from substore to section office and office to work spot
Drilling / Less than 23mm holes per hole / Slatted holes of slotted holes
Erection of 11 KV Roating AB Switch
Transformer pedestal RCC, including Earth Work 1*1*0.6 mtr. Column GL 0.45*0.45 2.10 Mtr. Slab 0.9*0.8*0.15 Mtr or PCC Transformer pedestal - 1.35*1.05 Mtr size height above GL 2.10mtr below GL 0.9Mtr
plinth work for upto 100KVA DT with Construction materials ( Under ground 3" + above Ground 7") (4.6*3.6")
Dismantling of Normal 11 KV AB Switch
OrdinaryTree Clearance
Coconut Tree Clearance
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 0.17 MB
BOQ_764221.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid