Tender Value
Refer Docs
EMD Value
₹18,220
Closing Date
17 Jul 2026, 5:00 pm
Divisional Officer
RURAL WORKS DIVISION, BHAWANIPATNA
Attigaon to Masigaon_Road_WMM in patches,Primer,Tack coat, PMC and SC, White washing of CD_0.000 to 1.335
2026_CERWI_133723_1
SERWBPT/ONLINE-01/2026-27
National Competitive Bid
Civil Works - Roads
30 days
Kalahandi
2 documents required · 2 mandatory
₹6,000
₹18,220
Yes
30 Jun 2026
30 Jun 2026
18 Jul 2026
30 Jun 2026
17 Jul 2026
30 Jun 2026
30 Jun 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer in charge. | 360 | sqm | 2.86 | ₹1,029.6 |
| 2 | Cleaning the existing Black topped surface with removal of foreign materials with brooms or soft btrushes and finally dusting with old gunny bages and/or compressed air to receive bituminous etc complete as per direction of EIC. | 750 | sqm | 5.59 | ₹4,192.5 |
| 3 | Providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the materials with water at OMC in mechanical mix plant carriage of mix etc. | 1.13 | cum | 2,614.16 | ₹2,954 |
| 4 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Technical Specification Clause 502 of MOSRT&H including cost, conveyance, royalty, taxes of chips and bitumen & other required materials etc. complete and as per direction of Engineer-In-Charge. | 7.53 | sqm | 91.23 | ₹686.96 |
| 5 | Providing and laying tack coat with penetration grade of bitumen emulsion (RS) of 0.20 Kg per Sqm after scraping cleaning the road surface including cost, conveyance royalty of all materials, T&P labour, hire charges of machinaries etc. complete as per Technical Specification Clause 503 of MOSRT&H and as per direction of the Engineer in charge. | 750 | sqm | 20.67 | ₹15,502.5 |
| 6 | Providing and laying semi dense bituminous concrete with 40-60 more TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per 4 th revision of MoRTH specification. clause No. 508 complete. | 20.06 | cum | 14,123.23 | ₹2,83,354.36 |
| 7 | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead and as per the direction of the Engineer-in-charge. | 15 | cum | 1,731.81 | ₹25,977.15 |
| 8 | Earth work in excavation of foundation in hard soil or gravelly soil within 50m.Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | 126.77 | cum | 282.89 | ₹35,861.97 |
| 9 | Supplying & filling good clean river sand inside the well/approach road including watering to complete saturation & ramming complete with all leads & lifts including cost. Conveyance royality & taxes of all materials & cost of all labour & T&P required for the work complete ( measurement will be taken for compacted section as per direction of Engineer-in-Charge.) | 9.96 | cum | 495.19 | ₹4,932.09 |
| 10 | Providing concrete for Plain/ Reinforced cement concrete in foundation / substructure complete as per drawing and MORD technical specification Cl. 802, 803, 1105(I), 1202 & 1203 of MORD and as per direction of EIC
10.1 (A) PCC Grade M - 15 for foundation and plinth | 29.22 | cum | 5,841.54 | ₹1,70,689.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.17 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_598841.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid