| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹9,700.54 (5.29%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹14,550.81 (7.94%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.0 L+₹20,371.13 (11.1%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
28 Jul 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt of Lane from the H/O Raghubir Singh to Onwards and Const of lane from the H/O Ramesh lal to onwards and Lane from the H/O Rattan Lal to Onwards Pyt. Chanu Chak Block Marh District Jammu under Scheme District Capex Budget PRI for Financial Yea
2026_RDPR_316135_6
e-NIT No. 147 REWJ of 2026-27 dated 15-07-2026
Open Tender
Civil Works
Percentage
30 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹3,880
14 Aug 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil including all leads, lift and carriage complete. | - | cum | 479.3 | - |
| 2 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40mm nominal size) | 7 | cum | 4,826.5 | ₹33,785.5 |
| 3 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregates 20mm nominal size) | - | cum | 5,733.6 | - |
| 4 | Centering and shuttering including strutting~ propping etc | - | sqm | 286 | - |
| 5 | slab | - | sqm | 718.2 | - |
| 6 | Edges of slab | - | sqm | 262.2 | - |
| 7 | Providing and laying 60mm thick factory made cement concrete
interlocking paver block of M-30 grade made by block making machine
with strong vibratory compaction and of approved size and design/shape
laid in required colour and pattern over and including 50mm thick
compacted bed of fine sand, filling the joints with coarse sand etc. all
complete as per direction of Engineer-in-charge | - | sqm | 816 | - |
| 8 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1
cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | - | sqm | 416.5 | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 7,788.4 | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | - | kg | 123.2 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1029485.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .