Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.5 LAdmitted-Finance | -0.10% | ₹14.5 L | L1 | Admitted-Finance |
| 2 | L2₹16.9 LAdmitted-Finance | +17.00% | ₹16.9 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹14.5 L
EMD Value
₹28,940
Closing Date
18 Mar 2026, 6:00 pmClosed
EE
PHED DN BARI
Work of Operation and Maintanance of 12 Nos. Completed JJM Scheme Under Div Bari
2026_PHCJA_544897_1
72
Open Tender
Civil Works
180 days
BARI
refer to td
3 documents required · 3 mandatory
₹500
EE PHED DN BARI/ MD RISL JAIPUR
₹28,940
Yes
30 Mar 2026
10 Mar 2026
19 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed. 1 km to 50 km - one fitter-II & one beldar
Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month. (For Rural Scheme where three phase electric supply is up to 8 hrs) 11 HP t0 12.5 HP
Supply of laboure for operation of Scheme under JJM.
Rewinding of three phase squirrel cage induction motor of Monoblock pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire ) ,'E' class insulation material and testing of motor on no load but to be guaranteed against testing on load at site , including transportation of motor pump to and from Div/AEn/JEn store complete as per direction of engineer in charge . 20.0 HP
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
td72.pdf
Tender Documents • 1.76 MB
BOQ_972016.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid