Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC | ₹26.1 L Quoted ₹22.2 L | L1 | Accepted-AOC AoC |
| 2 | L2₹22.2 L+₹221.60 (0.01%)Rejected-Finance | ₹22.2 L+₹221.60 (0.01%) | L2 | Rejected-Finance Rejected |
Tender Value
₹26.1 L
EMD Value
₹53,000
Closing Date
20 Mar 2026, 12:00 pmClosed
EE RED ,Vikas Bhawan, Sultanpur
EE RED ,Vikas Bhawan, Sultanpur
Under District Sultanpur, Construction of Culvert on the drain next to the house of Awadhesh Singh Sepoy behind St Xavier School in Ghasiganj Ward, Lot No 7
2026_REDUP_1125493_7
2988/EE RED Sultanpur/25-26 Dt 26/02/2026
Open Tender
Civil Works
Percentage
120 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹53,000
EE RED ,Vikas Bhawan, Sultanpur
6 Jul 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | E/W in making road ramps including all lead lift proper disposal & T&P etc. | 1 | cum | 187.25 | ₹187.06 |
| - | Removing all types of Hume pipes and stacking within a lead of 1000 in including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202 | - | Rm | 449.09 | - |
| - | Dewatering during costruction by 10HP dewatring pump | - | kwh | 39.86 | - |
| - | E/W in foundation including lead up to 30m and lift up to 1.50m and its disposal and back filling including all cost of labour and T&p. | - | cum | 118.75 | - |
| - | Laying of PCC in 1:3:6 (M-10) with stone ballast 20mm to 40mm size and coarse sand FM not less than 2.00 including all cost of labour and T&P. | - | cum | 6,597.75 | - |
| - | 1st class brick work in 1:4 cement mortar with coarse sand FM not less than 2.00 in making abutment, toe wall, parapet & wing wall including cost of all material labour T&P etc. | 1 | cum | 5,953.65 | ₹5,947.7 |
| - | 1st class brick work in 1:4 cement mortar with coarse sand FM not less than 2.00 in making abutment, toe wall, parapet & wing wall including cost of all material labour T&P etc. | - | cum | 6,601.55 | - |
| - | Laying of PCC in 1:2:4 complet in bed floor all respect. | - | cum | 6,982.5 | - |
| - | Providing fixing centering & shuttering for slab,abutment and pier per m2 | 1 | Sqm | 313.5 | ₹313.19 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.41 MB
Tendernotice_2.pdf
PDF • 6.97 MB
BOQ_2098069.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .