Tender Value
₹60.6 L
EMD Value
₹1.2 L
Closing Date
22 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ELECT G
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of "V/N" or "V" whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar Nature of Work are as follows for this work:- 1) Erection & commissioning of 11/33 kV overhead lines. 2) Installation & commissioning of 11/33 kV Substation. 3) Installation & commissioning of 33kV Substation. 4) Laying & Commissioning of electrical cabling works of 11/33kV. 5) Any above work or combination of (i) to (iv) above.
15 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the Qualifying criteria mentioned in the tender document. It will not be obligatory on the part of tender committee to scrutinize beyond the submitted document of tenderer as far as his qualification for the tender is concerned. The railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway there under.
No post tender correspondence shall be entertained after closing of tender even Suo moto post tender letters of the tenderers shall be treated as null/void.
The tenderers are required to observe the website to find out if any correction slips issued subsequent to uploading of the Tender . Railway reserves the right to make any additions/alterations to the tender uploaded and issue corrigendum to the same effect. In case the tenderer fails to take note of the above corrigendum, the additions and alterations entered/effected in the corrigendum shall be binding upon the tenderer and no claim what so ever will be entertained by Railway.
The tenderer should upload the documents carefully. The documents uploaded by tenderer should be clearly visible and in legible format.
Indian Railways Standard General Conditions of contract 2022 along with correction slips corrected up to date of closing of tender and the attached documents are part of the tender document.
The offers which are incomplete, without supporting documents, unsigned, conditional, will be summarily rejected.
As per letter No. 2022/CE-I/CT/GCC/Correspondence/ New Delhi, dated 14.05.2024 "On IREPS Module , a facility has already been created for online submission of Annexure-V. Therefore, the provision of downloading of Annexure-V of GCC & uploading of physically signed Annexure-V by tenderer had been discontinued on IREPS"
Remodeling of receiving yard at NKJ to increase CSR/CSL of lines in receiving yard at NKJ
JBP-L-T-No-45-2025R~WCR
JBP-L-T-No-45-2025R
Open
Works - General
6 Months
Jabalpur, Madhya Pradesh
₹0
₹1.2 L
22 Jun 2026
29 May 2026
8 Jun 2026
31 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 60,55,940.36 | ||
| details. | Breakup for | — | — | ||
| Supply, fabrication, erection, testing & commissioning of LT power panel 440V outdoor type made of 2mmMS sheet with cover & locking arrangement duly painted with two coat of red oxide & powdercoating (7 process) with requiredaccessories for fixing as per Railways specification attached. The panelshall have Copper Bus Bar of suitable size.(A). Incomingfeeder: (2 x 400 Amps MCCB (B) Out goingfeeder : 2x200 Amp MCCB, 3x100 Amp MCCB and 3x63 Amp including MS channel, Gland, lugs,Suitable Foundation , earthing MCCB, Make- ABB, Legrand, L&T, Hager, Schnider, or simillar make | — | — | — | 4,12,440.3 | |
| details. | Breakup for | — | — | ||
| Drilling of horizontal bore below track / road/ soil/ concrete by pushing method for laying of HDPE pipeup to 450 mm dia( HDPE Pipe will be supply by contractor ) | — | — | — | 49,58,560 | |
| details. | Breakup for | — | — | ||
| Supply and erection of Double pole structure complete with 152X152mm (37.1Kg/mtr) of11meters length along with supply and erection of DC cross arm of 100 X 50 mm, including setof 11KV pin insulators & strain insulators with associated hardware, DC cross arm for DO fuse &LA,transformer mounting cross arm with suitable clamping set, along with suitable horizontaland cross bracing, MS nut, bolts, clamps, stay arrangment etc. | — | — | — | 1,87,938.54 | |
| details. | Breakup for | — | — | ||
| Dismentalling of overhead wire by cutting | — | — | — | 809.55 | |
| details. | Breakup for | — | — | ||
| Dismentalling of insulator of overhead line | — | — | — | 640.29 | |
| details. | Breakup for | — | — | ||
| Dismentalling of bracket of over head line equipment | — | — | — | 640.15 | |
| details. | Breakup for | — | — | ||
| Dismantling of Rail pole/ H Beam / Octagonal Pole | — | — | — | 7,126.2 | |
| details. | Breakup for | — | — | ||
| Cable laying DOUBLE in earth: This involves Excavation of 1000mm deep trench in soil/hard murrum/tar road/below Railway track. After this the cable shall be laid and then both sides are to be covered with bricks. The rest of the trench to be refilled by sheaved earth. The cable shall be supplied free of cost by Rly's which shall have to be transported by the contractor from Rly. depot,JBP to the site | — | — | — | 1,97,712 | |
| details. | Breakup for | — | — | ||
| Supply & fixing of GI pipe of 150mm dia B class with necessary bends & clamps etc. for laying the cable under tar road, track crossing, hard soil, wall,pole truss etc . | — | — | — | 50,046.84 | |
| details. | Breakup for | — | — | ||
| Pipe earthing-Supply of material for earthing pit as per IS 3043, erection include excavation ofearth , filling of salt, charcoal, B class GI pipe with funnel at top with cast iron cover havinghandle and cement concrete chamber etc as per latest IS with inscription ligbility of IR value ontop of earth pit chamber with serial no etc. Then testing with earth tester | — | — | — | 27,984.7 | |
| details. | Breakup for | — | — | ||
| Supply and laying of 8/10/12 SWG GI wire a sper requireement of site | — | — | — | 1,419.36 | |
| details. | Breakup for | — | — | ||
| Supply, installation, testing & commissioning of 11 KV Outdoor type heat shrinkable cable termination kit up to 3 core 300 Sq.mm | — | — | — | 1,34,460.1 | |
| details. | Breakup for | — | — | ||
| :Supply & erection , testing & commissioning of indoor/outdoor LT heat shrinkable termination kit of 4core X 240-300 sq.mm. | — | — | — | 15,321.84 | |
| details. | Breakup for | — | — | ||
| Supply & fixing of cable route marker. | — | — | — | 2,638.25 | |
| details. | Breakup for | — | — | ||
| "Supply and Installation of Tap off Boxes type - PIBX-C-400 with provision of MCCB and fitted with C&S or similar make 4 Pole 250 A MCCB Thermal setting 80-100% In, All MCCBs should have an Adjustable setting range (In) from 70% to 100%, & Ics=100%Icu Each MCCB should have extended rotary handle for easy operation.The manufacturer should also submit all the test certificates in accordance IEC 61439 with Make- Legrand, C&S, ABB or similar, complete in all respect & as per railway requirement. complete in all respect as per instructions by site engineer" | — | — | — | 58,202.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
45-2025R.pdf
ATTACHMENT
AC11GCC_compressed.pdf
ATTACHMENT
AC08to10.pdf
ATTACHMENT
Allcorrectionslip.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .