| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-Finance | ₹17.0 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹19.0 L+₹2.0 L (12.0%)Rejected-Finance | ₹19.0 L+₹2.0 L (12.0%) | L2 | Rejected-Finance High Rates |
| 3 | L3₹19.4 L+₹2.4 L (14.1%)Rejected-Finance NO 1 RANGAJAN VILLAGE PO BOKULONI CHARIALI MAUZA TIPLING SUB DIVISION TENGAKHAT DIST DIBRUGARH ASSAM 786191 | DIBRUGARH | ASSAM | 786191 | ₹19.4 L+₹2.4 L (14.1%) | L3 | Rejected-Finance High Rates |
| 4 | L4₹19.9 L+₹2.9 L (17.2%)Rejected-Finance LOONPURIA GAON AT ROAD PANITOLA PO PANITOLA 786183 DIST TINSUKIA ASSAM | TINSUKIA | ASSAM | 786183 | ₹19.9 L+₹2.9 L (17.2%) | L4 | Rejected-Finance High Rates |
| 5 | L5₹20.7 L+₹3.7 L (21.7%)Rejected-Finance 01 CHANGSARI KAMRUP ASSAM 781101 | KAMRUP | ASSAM | 781101 | ₹20.7 L+₹3.7 L (21.7%) | L5 | Rejected-Finance High Rates |
| Sl No | Description | Qty | Unit | M/S Build Tech L2 | M/S N K SAI TRADING L1 | M/S SINGH TRADERS L3 | M/S A K BROTHERS L4 | M/s Singh enterprises L8 | M/S A K ENTERPRISE L5 | Saranga Saikia L9 | M/S R D CONSTRUCTION L6 | ASTRA INFRACON L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc 1.50 Metre wide and not exc 1.50 Metre depth for laying of UG Cable/Pipe/Pole/Stays / foundation/cable trench etc getting out in Soft/Loose Soil, complete all as specified and as directed. | 43.2 | Cum | 260 ₹11,232 Lowest | 320 ₹13,824 | 420 ₹18,144 | 300 ₹12,960 | 455 ₹19,656 | 311 ₹13,435.2 | 350 ₹15,120 | 318 ₹13,737.6 | 430 ₹18,576 |
| 2.00 | Returning filling in including spreading leveling watering and well ramming in layers not exceeding 25 cm spread any type of soil complete all as directed by Engr-in-Charge. | 20.74 | Cum | 90 ₹1,866.24 Lowest | 160 ₹3,317.76 | 300 ₹6,220.8 | 180 ₹3,732.48 | 340 ₹7,050.24 | 186 ₹3,856.9 | 220 ₹4,561.92 | 190 ₹3,939.84 | 315 ₹6,531.84 |
| 3.00 | Removing Surplus Soil to a distance not exc 50.00 Metre away and depositing where directed at a level not exc 1.50 Metre above the Starting Point, complete all as specified and as directed. | 22.46 | Cum | 110 ₹2,471.04 | 90 ₹2,021.76 Lowest | 180 ₹4,043.52 | 250 ₹5,616 | 225 ₹5,054.4 | 259 ₹5,818.18 | 290 ₹6,514.56 | 264 ₹5,930.5 | 200 ₹4,492.8 |
| 4.00 | M & L Sand Cushioning (dry) in trenches/ducts for protection of UG Cables (below, above and around the UG Cable laid in Trenches) of 23 Cm Spread thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) upto 180 mm thickness, complete all as specified and as directed.
Note : For the purpose of Payment, Punned thickness of Sand Cushioning only shall be measured and paid for. | 17.28 | Cum | 900 ₹15,552 | 1,540 ₹26,611.2 | 1,900 ₹32,832 | 890 ₹15,379.2 Lowest | 2,100 ₹36,288 | 924 ₹15,966.72 | 1,100 ₹19,008 | 945 ₹16,329.6 | 1,950 ₹33,696 |
| 5.00 | Supplying and laying un-reinforced precast concrete cable cover, Class LV, Type I, flat, size 250 mm x 150mm x 40mm complete all as specified and directed. | 1,440 | Each | 45 ₹64,800 Lowest | 48 ₹69,120 | 52 ₹74,880 | 55 ₹79,200 | 59 ₹84,960 | 57 ₹82,080 | 80 ₹1,15,200 | 58 ₹83,520 | 68 ₹97,920 |
| 6.00 | M & L for horizantal boring/drilling hole mannual under the road, pavement, hard standing in soft/loose soil without cutting/disturbing the existing road by trnchless technology and inserting GI pipe 80/50/40/32mm bore for drawing the cables complete all as specified and directed by Engineer-in-charge. Note: (i) Cost of acessories required for making hole/bore deemed to be included in the quoted rate. (ii) GI pipe laid shall be measured and paid separately | 10 | RM | 220 ₹2,200 Lowest | 850 ₹8,500 | 800 ₹8,000 | 900 ₹9,000 | 880 ₹8,800 | 934 ₹9,340 | 1,000 ₹10,000 | 955 ₹9,550 | 818 ₹8,180 |
| 7.00 | Supply and fix GI pipe light grade 32 mm bore (ISI marked) for protection of UG Cable laid in trenches/ road crossings/drain/floors/ceiling / along path / fixed to pole/wall up to junction box/DBs/Main switch board with and including all necessary Mild Steel Clamps, nuts, bolts, washers etc and all fittings as required, including taking down old GI tubing alongwith all fixing accessories complete all as specified and directed. | 12 | RM | 380 ₹4,560 Lowest | 520 ₹6,240 | 800 ₹9,600 | 500 ₹6,000 | 890 ₹10,680 | 519 ₹6,228 | 650 ₹7,800 | 530 ₹6,360 | 950 ₹11,400 |
| 8.00 | Description all as per item No.07 here-in-before above but 40mm bore. | 12 | RM | 440 ₹5,280 Lowest | 650 ₹7,800 | 840 ₹10,080 | 650 ₹7,800 | 930 ₹11,160 | 675 ₹8,100 | 750 ₹9,000 | 690 ₹8,280 | 980 ₹11,760 |
| 9.00 | Material and Labour for Plain Cement Concrete 1:3:6 type C-2 (using 40 mm graded stone aggregate) as in Foundation of pole/ filling, stays, mass concrete, etc. including formwork (as/if required) complete all as specified and as directed by Engineer-in-charge. | 1 | Cum | 5,600 ₹5,600 Lowest | 6,500 ₹6,500 | 10,000 ₹10,000 | 8,000 ₹8,000 | 10,800 ₹10,800 | 8,308 ₹8,308 | 12,000 ₹12,000 | 8,499 ₹8,499 | 11,000 ₹11,000 |
| 10.00 | Material and labour in repairs for Plain Cement Concrete (1:3:6) type C-1 (using 20 mm graded stone aggregate) as in pole coping including necessary form work for fair finish surfaces duly breaking the old damaged and placing a new flush box for termination inside the base complete all as specified and as directed.
Note : Rate deemed to be included of CRCA sheet made out of sunken box with terminals. | 0.5 | Cum | 6,200 ₹3,100 Lowest | 7,200 ₹3,600 | 10,500 ₹5,250 | 8,500 ₹4,250 | 10,800 ₹5,400 | 8,828 ₹4,414 | 9,400 ₹4,700 | 9,031 ₹4,515.5 | 11,500 ₹5,750 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
25 Jul 2026, 6:00 pmClosed
Garrison Engineer Dinjan No 02
GE Dinjan No 2 Post Dinjan Dist Tinsukia Assam Pin 786 189
REPAIR/REPLACEMENT OF SECURITY LIGHT,TIMER PANEL, SOLAR STREET LIGHT,STREET LIGHT POLES,FLOOD LIGHT,JUNCTION BOX,ACSR CONDUCTOR AND CONNECTED ALLIED SERVICES AT OUT POCKETS UNDER GE DINJAN NO.2
2026_MES_775124_1
8967/E8
Open Tender
Civil Works
Item Rate
180 days
As Per NIT
Pls Refer Tender Documents
9 documents required · 9 mandatory
₹500
GE Dinjan No.2
₹40,000
Yes
25 Aug 2026
27 Jun 2026
1 Aug 2026
27 Jun 2026
25 Jul 2026
11 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exc 1.50 Metre wide and not exc 1.50 Metre depth for laying of UG Cable/Pipe/Pole/Stays / foundation/cable trench etc getting out in Soft/Loose Soil, complete all as specified and as directed. | 43.2 | Cum | - | - |
| - | Returning filling in including spreading leveling watering and well ramming in layers not exceeding 25 cm spread any type of soil complete all as directed by Engr-in-Charge. | 20.74 | Cum | - | - |
| - | Removing Surplus Soil to a distance not exc 50.00 Metre away and depositing where directed at a level not exc 1.50 Metre above the Starting Point, complete all as specified and as directed. | 22.46 | Cum | - | - |
| - | M & L Sand Cushioning (dry) in trenches/ducts for protection of UG Cables (below, above and around the UG Cable laid in Trenches) of 23 Cm Spread thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) upto 180 mm thickness, complete all as specified and as directed.
Note : For the purpose of Payment, Punned thickness of Sand Cushioning only shall be measured and paid for. | 17.28 | Cum | - | - |
| - | Supplying and laying un-reinforced precast concrete cable cover, Class LV, Type I, flat, size 250 mm x 150mm x 40mm complete all as specified and directed. | 1,440 | Each | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tender.pdf
Tender Documents • 1.24 MB
BOQ_867969.xls
BOQ • 5.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .