| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC | ₹4.5 Cr Quoted ₹4.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 Cr+₹17.7 L (4.35%)Rejected-Finance | ₹4.2 Cr+₹17.7 L (4.35%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.4 Cr+₹28.6 L (7.03%)Rejected-Finance | ₹4.4 Cr+₹28.6 L (7.03%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹4.7 Cr+₹67.1 L (16.5%)Rejected-Finance | ₹4.7 Cr+₹67.1 L (16.5%) | L4 | Rejected-Finance Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Turnover of 2020-21, 2021-22 and 2022-23 not submitted as per SBD clause |
Tender Value
₹6.4 Cr
EMD Value
₹12.8 L
Closing Date
9 Jun 2026, 5:00 pmClosed
Superintending Engineer PMGSY Circle Jammu
SUPERINTENDING ENGINEER PMGSY CIRCLE JAMMU NEAR TIGER DIVISION BURMA DWAR OPP MILITARY HOSPITAL SATWARI CANTT JAMMU
Construction and Maintenance of road from L116 Km 4th of Balakote Behrote Road to Dullian Sandote, Package No. JK11-4519, PMGSY-IV, Batch-I of 2026-27, Block Balakote District Poonch. (Using Waste Plastics) Length 2.82 Kms
2026_JKRRD_147752_1
JK114519
Open Tender
Civil Works - Roads
Percentage
335 days
Balakote
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
₹12.8 L
Superintending Engineer PMGSY Circle Jammu
24 Jul 2026
19 May 2026
10 Jun 2026
19 May 2026
9 Jun 2026
22 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Hilly Roads:- Excavation in all kinds of soil, Soft Rock & Hard Rock, by mechanical means including cutting and trimming of side slopes & disposing of Excavated earth with all lift and leads as directed for safe disposal of un-serviceable/surplus excavated material without damaging private/public property As per Technical specification clause 1603.1. and 1603.2 . | 35,736.96 | cum | 222.41 | ₹79,48,257.27 |
| 2 | Construction of embankment with approved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structures
graded and compacted to meet requirement of Tables 300.1 and 300.2 as per
Technical Specification Clause 301.5 | 2,500 | cum | 77.14 | ₹1,92,850 |
| 3 | Earthwork in excavation for structures in all kinds of soil,Soft rock and Hard rock as per drawing and technical specification Clauses 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal upto a lead of 50m without damaging public/private properties, dressing of sides & bottom and backfilling in trenches with excavated suitable material. | 2,999.37 | Cum | 605.45 | ₹18,15,968.57 |
| 4 | Providing & Laying plain cement concrete of M-10 Grade in open foundations complete as per drawings and technical specification Clause 802,803,1202 & 1203, including all leads,lifts and carriage of materials by mechincial transports etc complete. | 267.17 | Cum | 5,657.58 | ₹15,11,535.65 |
| 5 | Plain/reinforced cement concrete M-15 Grade in foundation complete as per drawings & technical specification clauses 802,804,805,806,807,1202 ans 1204 For Height upto5m.including all leads,lifts and carriage of materials by mechincial transports etc complete. | 519.06 | Cum | 5,832.83 | ₹30,27,588.74 |
| 6 | Plain/reinforced cement concrete M-20 Grade in substructure complete as per drawings & technical specification clauses 802,804,805,806,807,1202 ans 1204
For Height upto5m.including all leads,lifts and carriage of materials by mechincial transports etc complete. | 64.75 | Cum | 6,430.25 | ₹4,16,358.69 |
| 7 | Providing and laying reinforced cement concrete M-25 Grade in suberstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5. including all leads,lifts and carriage of materials by mechincial transports etc complete. | 40 | Cum | 7,719.73 | ₹3,08,789.2 |
| 8 | Polygonal/RANDOM RUBBLE masonry, UNCOURSED/ brought to courses in 1 cement: 6 fine sand mortar, with nalla stone in substructure, including leveling up at specified levels with M-5 concrete; including cost of Through/Bond stones.including all leads,lifts and carriage of materials by mechincial transports etc complete. | 1,649.31 | Cum | 5,432.73 | ₹89,60,255.92 |
| 9 | Polygonal/RANDOM RUBBLE masonry, UNCOURSED/ brought- to- course, laid dry with Nallah stone , in sub structure; including cost of bond stones, including all leads,lifts and carriage of materials by mechincial transports etc complete. | 630.34 | Cum | 3,276.1 | ₹20,65,056.87 |
| 10 | Backfilling behind abutment, wing wall & return wall complete as per drawings & technical specification clause 1204.3.8, | 328.93 | Cum | 1,469.09 | ₹4,83,227.77 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.07 MB
sbdmendhar.pdf
Tender Documents • 1.88 MB
BOQ_230600.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .