Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-AOC AT PO BANGOMUNDA KANTABANJI PS BANGOMUNDA DIST BALANGIR PIN 767040 | BANGOMUNDA | BALANGIR | ODISHA | 767040 | L1 | Accepted-AOC First lowest in transparent lottery system | |
| 2 | L1₹6.7 CrRejected-AOC RAM NAGAR 4TH LANE LANJIPALLI BERHAMPUR | BERHAMPUR | GANJAM | ODISHA | 760008 | L1 | Rejected-AOC First lowest | |
| 3 | L1₹6.7 CrRejected-AOC AT KALAMPUR PO KALAMPUR DIST KALAHANDI ODISHA PIN 766013 | KALAMPUR | KALAHANDI | ODISHA | 766013 | L1 | Rejected-AOC First lowest | |
| 4 | L1₹6.7 CrRejected-AOC AT BELTIKIRI SADAR DHENKANAL | L1 | Rejected-AOC First lowest | |
| 5 | L1₹6.7 CrRejected-AOC AT WARD NO 08 SHANTINAGAR SUNABEDA PO SUNABEDA NAC DIST KORAPUT 763001 | SUNABEDA | KORAPUT | ODISHA | 763001 | L1 | Rejected-AOC First lowest |
Tender Value
₹7.9 Cr
EMD Value
₹7.9 L
Closing Date
22 Aug 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Construction Engineer
CCE R and B Circle Rayagada
Road Works
2025_EICCL_116591_2
CCE R and B RGDA- 03/2025-26
National Competitive Bid
Civil Works - Roads
Percentage
300 days
Rayagada
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹7.9 L
Yes
30 Mar 2026
7 Aug 2025
25 Aug 2025
7 Aug 2025
22 Aug 2025
7 Aug 2025
7 Aug 2025 - 18 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass,bushes, shrubs, saplings and tree girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000 meters including removal and disposal of top organic Soil notexceeding 150mm in thickness as per clause 201 of MORT&H Spesifications for Road & Bridge works. | 1,524 | One Sqm | 8.45 | ₹12,877.8 |
| 2 | Excavation for road way in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and disposal of soil using tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with in all lifts and leads upto 1000m for reuse as per clause No.-301 of MoRT&H including cost, conveyance, of all materials with all labour and T&P required for the work etc. complete as per standard specification and direction of Engineer-in-charge. | - | One Cum | 74.79 | - |
| 3 | Scarifying of B.T road surface to a depth of 50 mm and disposal of scarified material and stacking them away from work site within initial leads upto 1000mtr. and all lifts including stacking the useful materials and leveling the disturbed existing metal surface with picked out metals including cost of all labour, T&P ,all machineries etc. complete as per direction of the Engineer-in-charge. | 5,334 | One Sqm | 6.03 | ₹32,164.02 |
| 4 | Construction of embankment with approved materials deposited at site from roadway cutting and foundation excavation of CD & structures graded and compacted to meet requirement of table 300-2 including cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -305 of MoRT&H Specifications for Road & Bridge worksincluding cost, conveyance, royalty and taxes of all materials, all labour with T&P required for the work etc. complete as per technical specification and direction of Engineer-in-Charge. | 4,751.74 | One Cum | 35.83 | ₹1,70,254.84 |
| 5 | Construction of embankment with approved material obtained from borrow pits by mechanical means with all lifts and leads, transporting to site, spreading, grading and compacting to meet requirement of table 300-2 including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -305 of MoRT&H Specifications for Road & Bridge workscomplete as per technical specification and direction of Engineer-in-Charge. | 63,577.82 | One Cum | 203.79 | ₹1,29,56,523.94 |
| 6 | Providing compacted granular materials in shoulder/divertion road by using moorum having required PI value with sand admixture if required, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, as per approved drawing and technical specifications and as per Clause 407 of MORT&H specifications for Road and Bridge works including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T & P etc complete. | 76.2 | One Cum | 979.54 | ₹74,640.95 |
| 7 | Construction of Granular sub-base by providing Close graded Granular sub-base Grading VI materials as per table 400.2, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix-in-place method with rotovator at OMC, and compacting with VRR to achieve the desired density complete as per clause 401 of MoRTH specification for Road and Bridge works (Latest revision) including cost, conveyance royalty and taxes of all material and labour with T&P required for the work etc. complete in all respect as per drawing and Tecnical Specification and as directed by the Engineer-in- Charge (measurement to be taken on finished compacted thickness under OMC compaction). | 1,903.5 | One Cum | 1,644.49 | ₹31,30,286.72 |
| 8 | Providing,laying Wet Mix Macadam in compacted layers using hard granite crushed aggregate and crushed stone screened dust as per Clause No. 406 and Material as per table 400-11 , Section 900 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (latest Revision)mixing using in a WET MIX PLANT AND laying using PAVER FINISHER ONLY and compacting using VIBRATOR ROLLER &including cost of all materials, labour, T&P, taxes, royalty cost of all machineries etc complete in all respect and as per direction of the Engineer-in-charge. | 1,563.28 | One Cum | 2,054.91 | ₹32,12,399.7 |
| 9 | Providing and Applying Primer coat with bitumen emulsion @ 0.6 kg of bitumen per sqm. on the prepared bituminous/ granular surface including scraping and cleaning the road surface as per clause 502 of MoRT&H specification for Road & Bridge works, including hire and running charges of all machineries, including cost, conveyance, royalty and taxes of all materials, all labour with T&P required for the work etc. complete as per technical specification and direction of Engineer-in-Charge. | 6,253.11 | One Sqm | 38.09 | ₹2,38,180.96 |
| 10 | Providing and Applying Tack coat with bitumen emulsion @ 0.20 kg of bitumen per sqm. on the prepared bituminous/ granular surface including scraping and cleaning the road surface as per clause 503 of MoRT&H specification for Road & Bridge works , including hire and running charges of all machineries, including cost, conveyance, royalty and taxes of all materials, all labour with T&P required for the work etc. complete as per technical specification and direction of Engineer-in-Charge. | 6,253.11 | One Sqm | 12.69 | ₹79,351.97 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
BOQ_548637.xls
BOQ • 0.36 MB
DTCN_BGKR.pdf
Tender Documents • 1.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .