Loading…
Loading…
Tender Value
₹39.2 L
EMD Value
₹78,500
Closing Date
11 Aug 2026, 3:30 pm
Repair & Comprehensive Annual Maintenance Contract (CAMC) of IPIS Integrated Passenger Information System installed at Prayag (PRG) and Ayodhya Cantt (AYC) Railway Station (Make: FIEM) for Three years over Lucknow Division of Northern Railway.
106-Tele_Tender_21_26-27
106-Tele_Tender_21_26-27
Open
Works - General
36 Months
Ayodhya, Uttar Pradesh
₹0
₹78,500
21 Jul 2026
21 Jul 2026
28 Jul 2026
A-SCHEDULE-A REPAIR OF COACH GUIDANCE DISPLAY BOARD
Repairing, testing and installation of defective Coach Guidance Display Boards (double faced) CGDBs . All required materials/cards to be supplied by Contractor.
B-COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT
Comprehensive AMC of Double Faced Coach GuidanceDisplay Boards As per RDSO 02 Specification : RDSO/SPN/TC/61/2015/2019,Ver.-4.0/0.0 or latest" . Total no. of Double Faced Coach Guidance Display Boards 57 working & 15 nos. faulty to be repaired. (AYC Total no. in 36 Months = 57*36 = 2052 Nos-Months) + (Total no. in 30 Months = 15*30 =450 Nos-Months) = 2502 PRG Total no. in 36 Months = 54*36 = 1944 Nos-Months. + Total no. in 30 Months = 12*30 = 360 Nos-Months. Number-
Comprehensive AMC of Central Data Controller (CDC)with all accessories including Central Data Switch as per Specification No. RDSO/SPN/TC/108/2015/2019, Ver.-4.0/0.0 or Latest for 03 IP Based Integrated Passenger Information System (IPIS) loaded withOperating (driving) software as per Specification No.RDSO/SPN/TC/108/2015/2019, Ver.-0.0 / 4.0 ammdt 1 or latest. Total no. of Central Data Controller (CDC) with all accessories including Central Data Switch =1 no. per year, Total no. in 36 Months =1x36 =36 Number-Months.PRG Total no. in 36 Months =1x36 =36 Number- Months. Number-
Comprehensive AMC of Loaded with Operating (driving) software as per Specification No.RDSO/SPN/TC/108/2015/2019, Ver.-0.0 / 4.0ammdt 1 or latest. Total no.of Loaded with Operating(driving) software =1 no. , Total no.in 36 months = 1x36=36 Number-months. PRG Total no. in 36 Months =1x36 =36 Number-Months. Number-
Comprehensive AMC of platform data controller as per Specification No. RDSO/SPN/TC/108/2015/2019, Ver.-4.0/0.0 or Latest. Total no. of platform data controller = 3 nos, Total no. in 36 months = 3x36=108 Number-Month. " PRG Total no. of platform data controller = 3 nos, Total no. in 36 months = 3x36=108 Number-Month. " Number-
Comprehensive AMC of LED based Single faced Five line Train arrival/departure 06 display board as per RDSO's Specification No RDSO/SPN/TC/108/2015/2019, Ver.-4.0/0.0 or latest. Suitable clamping arrangement and all consumable materials including steel frame to be supplied by the contractor.Total no. of LED based Single faced Five line Train arrival/departure display board =1 no. per year Totalno.in 36 Months = 1 *36 = 36 Number - Month. Number-
Comprehensive AMC of Single line double faced Train Arrival Departure Display Board As per RDSO Specification RDSO/SPN TC/61/2015/2019,Ver.-4.0/0.0 or latest. Total no.of Single line double faced Train Arrival Departure Display Board =2 no. per year Total no.in 3 years = 2x36 =72 Number - Month Number-
Comprehensive AMC of LED based Single double faced At a Glace display board As per RDSO Specification RDSO/SPN/TC/61/2015/2019,Ver.-4.0/0.0 or latest. Totalno. of LED based Single double faced At a Glace display board =2 no. per year, PRG Total no. in 36 Months = 2x36 =72 Number-Month. Number-
Comprehensive AMC of 05KVA UPS at least 1 hour battery back up in full load 09 condition complete with all accessories as per technical Specification Make: UNILINE/NUMERIC/ APC /MICROTEK or similar. Thisalso includes maintenanceof battery rack MCBs complete with cover & fixing materials, SMF/VRLA batteries for 04years. Total 5 KVA UPS = 1 Nos, Total quantity in 36 months =1*36 = 36 Number-Month. PRG Total no. in 36 Months =1x36 =36 Number-Months. Number-
Comprehensive AMC of 4 digit GPS synchronised digital clock (double side) with all 10 accessories as per RDSO Specification RDSO/SPN/TC@47>47@2008 Rev. 3.0 or latest. Total no. of 4 digit GPS synchronized digital clock (double side) with all accessories = 6 no. per year Total no.in 36 months =6x36=216 Number - months." PRG Total no. of Clock= 5 nos, Total no. in 36 months = 5x36=180 Number-Month. " Number-
Comprehensive AMC of Control console complete for auto announcement system 11 (Maximum for two language i.e. English & Hindi with various types of display boards and coach guidance system as per RDSO specification No RDSO/SPN/TC/61/2007 Rev2.0 or latet amendment including feeding data with relevant software, cabling," UPS and traing to commercial and operating staff. Total no. of Control console complete for auto announcement system = 01 no. per year Total no.in 36 Months = 36x1 = 36 Number-Month "
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCACS11.pdf
ATTACHMENT
ACSGCC22-231to6.pdf
ATTACHMENT
GCC Correction slip 7 to 10
ATTACHMENT
GCC_April-2022_1.pdf
ATTACHMENT
TD-21.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipno7-10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].