Loading…
Loading…
Tender Value
₹45.8 L
EMD Value
₹45,836
Closing Date
25 Jun 2026, 1:40 pm6d left
Similar tender results from the same govt authority in the past 3 years.
SERWD,Kamakhyanagar
SERWD,Kamakhyanagar
Construction of Principal Room , Office Room ,Classrooms at Tapoban Higer Secondary School Building at Kuninda during 2026-27 .
2026_CERWI_132315_1
KNR-04/2026-27
Open Tender
Civil Works - Buildings
180 days
Dhenkanal
2 documents required · 2 mandatory
₹6,000
₹45,836
Yes
18 Jun 2026
18 Jun 2026
26 Jun 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
18 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in Ordinary soil or gravelly soil within 50m.Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | 163.02 | cum | 276.89 | ₹45,138.61 | NI-18-3347-1 |
| 2 | Filling in foundation and plinth with sand watered and rammed including cost, conveyance and royality and as per the direction of the Engineer-in-charge. | 42.3 | cum | 957.86 | ₹40,517.48 | NI-18-3347-2 |
| 3 | Cement concrete (1:3:6)with 4cm size hard granite crosser broken metal in foundation including cost, conveyance and royality and as per the direction of the Engineer-in-charge. . | 62.75 | cum | 6,615.09 | ₹4,15,096.9 | NI-18-3347-3 |
| 4 | Brick work with Flyash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in foundation and plinth including cost, conveyance and royality and as per the direction of the Engineer-in-charge. | 40.45 | cum | 6,114.17 | ₹2,47,318.18 | NI-18-3347-4 |
| 5 | Brick work with Flyash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Superstructure including cost, conveyance and royality and as per the direction of the Engineer-in-charge. | 51.71 | cum | 6,147.5 | ₹3,17,887.23 | NI-18-3347-5 |
| 6 | Cement Concrete (1:2:4) using 12mm size B.H.G.C.B. chips including cost, conveyance and royality and as per the direction of the Engineer-in-charge. | 119.76 | cum | 8,212.82 | ₹9,83,567.32 | NI-18-3347-6 |
| 7 | R.C.C-M-25 using 20mm and down graded chips laying & lowering concrete watering curing etc complete including cost of Steel Centering and Shuttering including cost, conveyance and royality and as per the direction of the Engineer-in-charge.(Columns upto Plinth) | 18.7 | cum | 5,566.34 | ₹1,04,090.56 | NI-18-3347-7 |
| 7.01 | Plinth Band | 5.49 | cum | 5,566.34 | ₹30,559.21 | NI-18-3347-8 |
| 7.02 | LINTEL | 2.38 | cum | 13,296.46 | ₹31,645.57 | NI-18-3347-9 |
| 7.03 | Column in superstructure | 5.36 | cum | 17,296.52 | ₹92,709.35 | NI-18-3347-10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.11 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_596942.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid