GEMC-511687703206985
Awarded to Dey's Enterprise
₹5.2 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Labour charges for manufacturing and repairing job of End carriage Platform cabin Ladder trolley assly CT Festoon Braket etc | DEYS ENTERPRISE / Labour Charges For Manufacturing And Repairing Job Of End Carriage Platform Cabin Ladder Trolley Assly CT Festoon Braket Etc | 9985 | 9 MT | 19,666.67 | 177,000.03 |
| Labour charges for assembly and installation of all mechanical items in the crane | DEYS ENTERPRISE / Labour Charges For Assembly And Installation Of All Mechanical Items In The Crane | 9985 | 1 LOT | 82,600 | 82,600 |
| Labour charges for installation and commissioning of all electrical items along with making of electrical connections of panel motors JB lights controller DSL etc in the crane | DEYS ENTERPRISE / Labour Charges For Installation And Commissioning Of All Electrical Items Along With Making Of Electrical Connections Of Panel Motors JB Lights Controller DSL Etc In The Crane | 9985 | 1 LOT | 100,000 | 100,000 |
| All surfaces shall be cleaned thoroughly All oils and greases shall be removed prior to painting One coat primer and two coat golden yellow should be applied to the crane | DEYS ENTERPRISE / All Surfaces Shall Be Cleaned Thoroughly All Oils And Greases Shall Be Removed Prior To Painting One Coat Primer And Two Coat Golden Yellow Should Be Applied To The Crane | 9985 | 1 LOT | 39,000 | 39,000 |
| Load test of the crane with certificate from component authority as per WB factory act 1958 Form 8 | DEYS ENTERPRISE / Load Test Of The Crane With Certificate From Component Authority As Per WB Factory Act 1958 Form 8 | 9985 | 1 LOT | 18,000 | 18,000 |
| Labour charges for Erection and commissioning of the whole crane including lifting tackles etc | DEYS ENTERPRISE / Labour Charges For Erection And Commissioning Of The Whole Crane Including Lifting Tackles Etc | 9985 | 1 LOT | 100,000 | 100,000 |