Loading…
Loading…
Tender Value
₹3.4 L
EMD Value
₹6,860
Closing Date
25 Aug 2026, 4:00 pmDue tomorrow
XEN REW Kathua
XEN REW Kathua
Construction of Causeway/Scupper at Nallah Badhani, construction site is on the boundary of Ward No. 2, 4 and Construction of T/Road with edge wall from Mata Chamunda Mandir to the house of Paras Ram, Belli Ram house, Ward No. 2. Panchayat mukwal
2026_RDPR_321477_6
e-NIT No.188/REW/K of 2026-27 Dated 19/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Nagrota Gujroo
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹6,860
19 Aug 2026
19 Aug 2026
26 Aug 2026
19 Aug 2026
25 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas | 33.98 | SQM | 187.05 | ₹6,355.96 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 36.25 | CUM | 256.85 | ₹9,310.81 |
| 3 | Providing and laying in position dry stone aggregarte. All work upto plinth level with(stone aggregate of 40mm nominal size ) including spreading, compacting, and consolidation in all respect | 4.98 | CUM | 1,700 | ₹8,466 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 39.65 | CUM | 5,733.6 | ₹2,27,337.24 |
| 5 | supply and dumping of stone | 16.99 | CUM | 937.9 | ₹15,934.92 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15?, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1?:3 (1 cement : 1? coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.27 | CUM | 7,788.5 | ₹17,679.9 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 227 | kg | 123 | ₹27,921 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 35.13 | SQM | 286.35 | ₹10,059.48 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 12.1 | CUM | 218.3 | ₹2,641.43 |
| 10 | Providing and Laying ofexcavated earthincluding spreading, consolidation complete in all respect including Loading, unloading and carriage with in 5.0 km complete (to be quoted by Contractor) | 10.2 | CUM | 272 | ₹2,774.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.03 MB
BOQ_1073895.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].