Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.5 LAccepted-AOC | ₹89.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹90.0 LRejected-Finance | ₹90.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹90.4 LRejected-Finance | ₹90.4 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BINAY KUMAR MISHRA L3 | RAJIV KUMAR PANDEY L1 | ANKIT KUMAR MISHRA L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of 51 (Fifty -One) nos. Ventilation Stoppings at 34L/57R Development District in R-VI seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Preparation of site cleaning | 182.37 | Cubic meter | 661.9 ₹1,20,711.34 | 655.35 ₹1,19,516.18 | 658.63 ₹1,20,113.76 |
| 1.02 | Floor cutting in hard stone by hand | 18.81 | Cubic meter | 5,880.71 ₹1,10,616.25 | 5,822.49 ₹1,09,521.04 | 5,851.6 ₹1,10,068.64 |
| 1.03 | Floor cutting in coal by hand | 73.08 | Cubic meter | 1,637.66 ₹1,19,680.52 | 1,621.45 ₹1,18,495.57 | 1,629.56 ₹1,19,088.04 |
| 1.04 | P.B. work | 444.12 | Cubic meter | 6,921.12 ₹30,73,805.99 | 6,852.59 ₹30,43,372.27 | 6,886.85 ₹30,58,589.13 |
| 1.05 | Plastering(Both side) | 2,126.12 | Squrae Meter | 382.01 ₹8,12,203.99 | 378.23 ₹8,04,162.37 | 380.12 ₹8,08,183.18 |
| 1.06 | Loading and unloading materials from surface to UG | 1,874 | Tubs | 730.93 ₹13,69,757.01 | 723.69 ₹13,56,195.06 | 727.31 ₹13,62,976.04 |
| 1.07 | Mechanically transporting by own person(1500m above) | 937 | Tubs | 923.13 ₹8,64,972.72 | 913.99 ₹8,56,408.63 | 918.56 ₹8,60,690.67 |
| 1.08 | Manually pushing in tub(450-500m) | 937 | Tubs | 1,107.76 ₹10,37,969.15 | 1,096.79 ₹10,27,692.23 | 1,102.27 ₹10,32,830.69 |
| 1.09 | Lead for carrying materials at a dist(75m) | 937 | Tubs | 165.21 ₹1,54,797.74 | 163.57 ₹1,53,265.09 | 164.39 ₹1,54,031.42 |
Tender Value
₹89.5 L
EMD Value
₹1.1 L
Closing Date
31 Jan 2026, 9:00 amClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Construction of 51 (Fifty -One) nos. Ventilation Stoppings at 34L/57R Development District in R-VI seam of Khottadih Colliery, Pandaveswar Area
2026_ECL_351326_1
GM/PND/Sur/Ten/25-26/137/326 Dated 13.01.2026
Open Tender
Civil Works - Others
90 days
Khottadih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.1 L
13 Feb 2026
16 Jan 2026
2 Feb 2026
16 Jan 2026
31 Jan 2026
16 Jan 2026
16 Jan 2026 - 24 Jan 2026
Construction of 51 (Fifty -One) nos. Ventilation Stoppings at 34L/57R Development District in R-VI seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Preparation of site cleaning
Floor cutting in hard stone by hand
Floor cutting in coal by hand
P.B. work
Plastering(Both side)
Loading and unloading materials from surface to UG
Mechanically transporting by own person(1500m above)
Manually pushing in tub(450-500m)
Lead for carrying materials at a dist(75m)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_364073.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid