Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-AOC NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹12.3 L Quoted ₹10.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹11.6 LRejected-AOC | ₹11.6 L | 2 | Rejected-AOC L2 |
| 3 | 3₹12.4 LRejected-AOC | ₹12.4 L | 3 | Rejected-AOC L3 |
| 4 | 4₹14.4 LRejected-AOC 2 1 184 SALEM MAIN ROAD KUNJANDIYUR GONUR POST METTUR DAM 636404 SALEM DIST | METTUR DAM | SALEM | TAMIL NADU | 636404 | ₹14.4 L | 4 | Rejected-AOC L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Poor Vendor rating |
| Sl No | Description | Qty | Unit | SRINIVASA ENGINEERING CONTRACTORS L2 | TEAM ENGINEERING AND CONSTRUCTION L1 | SAMY CONSTRUCTION L4 | M/S MEGAVARSHINI ENGINEERING L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Material: Material Charges for one coat of Epoxy primer paint and one coat of Coal tar epoxy paint with suitable Epoxy thinner after cleaning the iron surface by sand blasting including scaffolding & sundry. | 2,165 | m2 | 109 ₹2.4 L | 375 ₹8.1 L | 134 ₹2.9 L | 115 ₹2.5 L |
| 2.00 | Labour:
Labour Charges for sandblasting and painting with one coat of Epoxy primer paint, and one coat of Coal tar epoxy paint with suitable Epoxy thinner after cleaning the iron surface by sand blasting by providing necessary scaffolding & sundry | 2,165 | m2 | 429 ₹9.3 L | 105 ₹2.3 L | 530 ₹11.5 L | 458 ₹9.9 L |
Tender Value
Refer Docs
EMD Value
₹15,430
Closing Date
8 Jan 2026, 12:00 pmClosed
SE EGC CO UKT
SE EGC CO UKT
Sand Blasting,Cleaning and painting of trash rack panels of Unit 1 2 at Barrage Power House 3 Kuthiraikalmedu
2025_EB_635720_1
SE/EGC/GL/10/25 26, Dt 23.12.25
Open Tender
Maintenance Works
Kuthiraikalmedu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,430
Yes
25 Mar 2026
24 Dec 2025
9 Jan 2026
24 Dec 2025
8 Jan 2026
24 Dec 2025
Material: Material Charges for one coat of Epoxy primer paint and one coat of Coal tar epoxy paint with suitable Epoxy thinner after cleaning the iron surface by sand blasting including scaffolding & sundry.
Labour: Labour Charges for sandblasting and painting with one coat of Epoxy primer paint, and one coat of Coal tar epoxy paint with suitable Epoxy thinner after cleaning the iron surface by sand blasting by providing necessary scaffolding & sundry
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_760797.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid