Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.7 LAccepted-AOC | L1 | Accepted-AOC Lowest Tender | |
| 2 | L2₹77.4 L+₹4.7 L (6.44%)Rejected-Finance VILLA 47 G F AASHINA VILLAS DELLIBABU NAGAR 1ST CROSS STREET AMBAL NAGAR PALLIKARANAI CHENNAI 100 | 100 | L2 | Rejected-Finance Other then Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹73,000
Closing Date
28 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Forest Engineer Tiruchirappalli Division
Office of the Forest Engineering Division Tirichirappalli, Chief Conservator of Forest Office Campus, Senthuram Street, JK Nagar, Trichy-620023
Construction of Cement road and Rain water harvesting system in Bethelpuram to Siruvattukadu to a length of (0.250)Km in Dindigul District.
2023_TNFD_399192_2
TN2472 / 2023-24 / D
Open Tender
Civil Works - Roads
Item Rate
30 days
Dindigul
as per Tender Document
7 documents required · 7 mandatory
₹0
₹73,000
12 Jan 2024
13 Dec 2023
29 Dec 2023
13 Dec 2023
28 Dec 2023
19 Dec 2023
Amount
Clearing the juliflora jungle uprooting on Road side as per standard specification as directed by the departmental officers and including all other incidental charges etc., complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A etc: complete, and as directed by officials
Scaffolding and centering charges for the structural components of abutment piers, bed block and deck slab including cost and conveyance of all material to the site including all labour charges and incidental charges etc., complete.
Plain Cement Concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at deoths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for BASE COURSE OF CC PAVEMENT.
Vibrated cement concrete M30 Grade Design mix using 20mm & 12mm ISS HBG metal including cost and cinveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting,curing and all incidental chargs etc., complete for C.C. Pavement
Providing and erecting Single sided Double Guard Metal Beam Crash Barrier system 1.70m high, comprising of 3mm thick wall “w” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms / sqm, minimum 950mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800rnm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS: 1367 clause 4.60 all complete as per Technial Specification arid as directed by the Engineer-in-charge
Providing and Fixing of Retro-Reflectorised cautionary star sigh made out of high intensity prismatic Grade reflective sheeting sticked over CR sheet. 20mm / 32G thickness with black enamel paints firmly fixed on the tree with 1 ½” X 14 G wire nails of size 100mm X 100mm
Construction of Side Drinage system Km 1/850 - 2/170
Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious mater and obstructions, trimming of bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per standard specification for Drain.
Filling with Quarry fines including cost and conveyance of material to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to bottom level inclusive all other incidental charges etc., complete below levelling course.
Plain Cement Concrete of grade M10 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Levelling course below Drain.
Vibrated Reinforced cement concrete of grade M20 (Design mix)using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Drain.
Sri Palanimurugan Traders
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_475288.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .