| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr Quoted ₹10.5 L | 1 | Accepted-AOC aoc |
| 2 | 2₹10.8 L+₹28,229.95 (2.69%)Rejected-Finance | ₹10.8 L+₹28,229.95 (2.69%) | 2 | Rejected-Finance 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not qualified in technical evelution |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified in technical evelution |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not qualified in technical evelution |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
30 Jan 2023, 5:00 pmClosed
EE
rdsc
re construction of vrb from sunehara mr km 1.500
2023_UPIDC_768344_1
95/rdsc/2/2022-23
Open Tender
Civil Works - Canal
Item Rate
30 days
raebareli
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹1.3 L
Yes
17 Feb 2023
21 Jan 2023
31 Jan 2023
21 Jan 2023
30 Jan 2023
21 Jan 2023
Amount
Earth Work in making Ramp / approach road / diversion including carriage of earth by means of transport and all labour , T&P required to complete the job with proper manual ramming and compaction to prepare earthen surface for immediate transportation use of road.
Dry Brick on edge solling for making Ramp including preparing sub-grade,filling joints with local earth spreading, a binding coat of 1 cm of local earth on entire surface made and all labour , T&P to complete the job per sq. metre.
Earthwork in excavation in foundation of masonary work including chharri-bajari, wet earth, slush kanker which is not separable i.e. all type of soils with all leads, lifts, labour, T&P and proper disposal etc but excluding dewatering to complete the work per cum.
Providing and laying A20-M10 mix (1:3:6) plain cement concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) in foundation complete in all respect excluding centering shuttering but including all cost of material, labour and T&P etc to complete the jobas per sanctioned drawing & specification in the direction of Engineer- In - Charge Per cum.
Providing and laying plain cement concrete A20-M15 mix (1:2:4) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing and Laying A20-M20 mix (1:1.5:3) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) with addition of water proofing admixture as per requirement to complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job Per cum.
Providing and Laying A20-M25 mix (1:1:2) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Brick masonry in 1:3 C.M with OPC cement and banda c-sand (F.M 1.5 - 2.0) mortar using M-150 class Bricks complete in all respect including all lead, lifts, all cost of material, labour, curing ,T&P required for proper completion of work as per sanctioned drawing & specification in the direction of Engineer-In -Charge. (Unit Cum.)
Brick masonry in 1:4 C.M with OPC cement and banda c-sand (F.M 1.5 - 2.0) mortar using M-150 class Bricks complete in all respect including all lead, lifts, all cost of material, labour, curing ,T&P required for proper completion of work as per sanctioned drawing & specification in the direction of Engineer-In -Charge. (Unit Cum.)
Struck cement pointing with cement sand mortar 1:2 complete in all respect including all lead lifts cost of materials labour and T&P etc. per sqm.
Centering & Shuttering of RCC work including rent of shuttering material labour & T&P required for proper completion of work in Sqm.
Providing and laying Tarfelt between abutment and slab per sqm.
Providing & fixing 60 mm dia PVC pipe in weep hole per R.M
Providing and Laying 25 mm thick bituminus fillar board Per Sqm.
Prviding and filling Local sand as per direction of Engineer- in - Charge at site per Cum.
Earth work in restoring canal section or drain section and dismentalling of diversion after construction of pacca work including all initial lead and lift , all labour and T&P with proper dressing to profile per Cum.
Hiring of diesel pumps 5 HP including suction & delivery pipes, operator & POL Per Hrs.
Hiring charges of 5 KV Gen set Including operator and P.O.L. for 8 hours running in night time. (Unit per day)
Providing bending, binding, and placing of reinforcement Fe-500 / Fe-550 TMT deformed bars conforming to IS code to complete all respect including cost of material , labour, binding wire, T&P etc. per M.T
Protection work after construction of pacca work -Providing and placing of sand/silt / earth filled new gunny bags, tying and sewing with sutli including lead upto 60M. stacking at proper places as per direction of engineer-in - charge per nos.
Protection work after construction of pacca work -Supplying and placing Bamboo khunta and braces of 60 to 80 mm dia. including all cost of material ,labour and T&P . As per direction of Engineer-In-Charge to complete the work per R.M.
ms rajesh kumar
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .