| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-Finance | ₹7.8 L | L1 | Accepted-Finance Accept |
| 2 | L2₹8.3 L+₹50,353 (6.48%)Rejected-Finance | ₹8.3 L+₹50,353 (6.48%) | L2 | Rejected-Finance Reject |
| 3 | L3₹8.8 L+₹1.0 L (12.9%)Rejected-Finance | ₹8.8 L+₹1.0 L (12.9%) | L3 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | DILA RAM L3 | HARISH L2 | Mr. Harish Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation drain & channels etc. earth all classification of earth work such as pick work jumper work pumping out water blasting softs /hard work in all same where blasting is prohibited in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring strutting, planking , timbering and dewatering wherever required , stacking usable and unusable material/ soil separately and after laying jointing and testing pipes, returning the usable soil in 15 Cm layers by ramming and watering and then desposing off all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of unmateled/ mateled surfaces top its orinal condition including cost of diversion of of trafffic, night signal boards, fixing of caution boards, crossing over trenches for acces to houses, fencuing etc. complete in all respects within all leads and lifts as per the directions of Engineer in Charge. | 856.8 | Per cubic meter | 375 ₹3,21,300 | 370 ₹3,17,016 | 315 ₹2,69,892 Lowest |
| 2.00Dismentalling of existing G.I pipe (Light class) including stacking of serviceable & unserviceable materials at site (earth work in trenches to be measured and paid for sepertally) with in all leads and lifts complete in all respects. | ||||||
| 2.01 | 15 mm dia | 1,480 | Per running meter | 21 ₹31,080 | 20 ₹29,600 Lowest | 21 ₹31,080 |
| 2.02 | 20 mm dia | 750 | Per running meter | 23 ₹17,250 | 21 ₹15,750 Lowest | 22 ₹16,500 |
| 2.03 | 25 mm dia | 650 | Per running meter | 35 ₹22,750 | 30 ₹19,500 | 28 ₹18,200 Lowest |
| 2.04 | 32 mm dia | 4,100 | Each | 40 ₹1,64,000 | 38 ₹1,55,800 | 35 ₹1,43,500 Lowest |
| 2.05 | 40 mm dia | 1,420 | Each | 50 ₹71,000 | 45 ₹63,900 Lowest | 50 ₹71,000 |
| 3.00Re Laying of old dismentalled G.I pipe (Light class) including stacking of serviceable & unserviceable materials at site (earth work in trenches to be measured and paid for sepertally) with in all leads and lifts complete in all respects. | ||||||
| 3.01 | 15 mm dia | 1,036 | Per running meter | 21 ₹21,756 | 20 ₹20,720 Lowest | 21 ₹21,756 |
| 3.02 | 20 mm dia | 525 | Per running meter | 23 ₹12,075 | 21 ₹11,025 Lowest | 22 ₹11,550 |
Tender Value
Refer Docs
EMD Value
₹21,010
Closing Date
25 Jun 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Arki
SH_ Dismantling Re-laying_ jointing_ testing and commissioning of GI pipe of various dia in distribution system under Jal Shakti Section Kandhar
2026_HPIPH_136484_6
ARK-SOL01-425-8213-63
Open Tender
Civil Works
Item Rate
90 days
Arki
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹21,010
9 Jul 2026
13 Jun 2026
25 Jun 2026
13 Jun 2026
25 Jun 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation drain & channels etc. earth all classification of earth work such as pick work jumper work pumping out water blasting softs /hard work in all same where blasting is prohibited in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring strutting, planking , timbering and dewatering wherever required , stacking usable and unusable material/ soil separately and after laying jointing and testing pipes, returning the usable soil in 15 Cm layers by ramming and watering and then desposing off all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of unmateled/ mateled surfaces top its orinal condition including cost of diversion of of trafffic, night signal boards, fixing of caution boards, crossing over trenches for acces to houses, fencuing etc. complete in all respects within all leads and lifts as per the directions of Engineer in Charge. | 856.8 | Per cubic meter | 1.25 | ₹1,071 |
| 2Dismentalling of existing G.I pipe (Light class) including stacking of serviceable & unserviceable materials at site (earth work in trenches to be measured and paid for sepertally) with in all leads and lifts complete in all respects. | |||||
| 2.01 | 15 mm dia | 1,480 | Per running meter | 1.25 | ₹1,850 |
| 2.02 | 20 mm dia | 750 | Per running meter | 1.25 | ₹937.5 |
| 2.03 | 25 mm dia | 650 | Per running meter | 1.25 | ₹812.5 |
| 2.04 | 32 mm dia | 4,100 | Each | 1.25 | ₹5,125 |
| 2.05 | 40 mm dia | 1,420 | Each | 1.25 | ₹1,775 |
| 3Re Laying of old dismentalled G.I pipe (Light class) including stacking of serviceable & unserviceable materials at site (earth work in trenches to be measured and paid for sepertally) with in all leads and lifts complete in all respects. | |||||
| 3.01 | 15 mm dia | 1,036 | Per running meter | 1.25 | ₹1,295 |
| 3.02 | 20 mm dia | 525 | Per running meter | 1.25 | ₹656.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
FORM_6_Job_6.pdf
Tender Documents • 0.11 MB
FORM_8_Job_6.pdf
Tender Documents • 1.49 MB
TERM_condition_Job_6.pdf
Tender Documents • 0.16 MB
BOQ_202017.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .