Tender Value
₹1.7 L
EMD Value
₹3,360
Closing Date
12 Aug 2026, 5:00 pmClosed
Sandeep Dahiya
DIV Faridabad
A/mtc of Sewerage Scheme in Sector-65, Faridabad. Repairing and Raising of manholes at various places in Sector-65, Faridabad and all other works contingent thereto.
2026_HBC_539274_1
2026C9A6991A 32D9 4CBE B79F DB32B55394AE248HSV
Open Tender
Civil Works
Works
30 days
Faridabad (MC)
A/mtc of Sewerage Scheme in Sector-65, Faridabad. Repairing and Raising of manholes at various places in Sector-65, Faridabad and all other works contingent thereto.
2 documents required · 2 mandatory
₹250
₹3,360
Yes
26 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
6 Aug 2026 - 8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | per cum | 3,968 | ₹3,964.03 |
| 2 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) | - | per sqm | 113 | - |
| 3 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 1 | per cum | 3,975 | ₹3,971.03 |
| 4 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | - | per kg | 66 | - |
| 5 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening | - | each | 1,155 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_618520.xls
BOQ • 0.34 MB
778797Z173459.pdf
Additional Documents • 0.24 MB
OT0173459.pdf
Other Document • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .