Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 CrAdmitted-Finance | ₹14.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹14.3 Cr+₹19.6 L (1.39%)Admitted-Finance | ₹14.3 Cr+₹19.6 L (1.39%) | L2 | Admitted-Finance |
| 3 | L3₹14.7 Cr+₹54.2 L (3.84%)Admitted-Finance | ₹14.7 Cr+₹54.2 L (3.84%) | L3 | Admitted-Finance |
| 4 | L4₹14.7 Cr+₹59.7 L (4.22%)Admitted-Finance DLG 13 14 PUSHPA COMPLEX HISAR HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹14.7 Cr+₹59.7 L (4.22%) | L4 | Admitted-Finance |
| 5 | L5₹14.7 Cr+₹60.2 L (4.26%)Admitted-Finance 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | ₹14.7 Cr+₹60.2 L (4.26%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PARMIL KUMAR L1 | M / S DAYANAND CONTRACTOR L3 | M/S LAXMI CONSTRUCTION CO. L5 | The Tibba Dana Sher Co Op L and C Society Limited L4 | UNIVERSAL CONSTRUCTION COMPANY L6 | m/s Bishan parkas & company L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Credit of old steel bars | 498 | Quintal | 3,000 ₹-14,94,015 Lowest | 3,000 ₹-14,94,015 Lowest | 3,500 ₹-17,43,017.5 | 3,500 ₹-17,43,017.5 | 3,000 ₹-14,94,015 Lowest | 3,000 ₹-14,94,015 Lowest |
| 2.00 | credit of bricks | 301.25 | cum | 880 ₹-2,65,100 Lowest | 880 ₹-2,65,100 Lowest | 1,100 ₹-3,31,375 | 880 ₹-2,65,100 Lowest | 880 ₹-2,65,100 Lowest | 880 ₹-2,65,100 Lowest |
| 3.00 | credit of bricks and B.Bats available from dismantling of Brick Masonry | 3,439.6 | cum | 880 ₹-30,26,845.36 Lowest | 880 ₹-30,26,845.36 Lowest | 1,080 ₹-37,14,764.76 | 1,100 ₹-37,83,556.7 | 880 ₹-30,26,845.36 Lowest | 880 ₹-30,26,845.36 Lowest |
| 4.00 | Fabrication (erection and commissioning of wheel assembly with GM bush of size 400*150 complete in all respect pf Engineer in charger | 40 | NO. | 34,700 ₹13,88,000 Lowest | 48,000 ₹19,20,000 | 40,000 ₹16,00,000 | 40,000 ₹16,00,000 | 40,000 ₹16,00,000 | 40,000 ₹16,00,000 |
| 5.00 | NS Item -providing, fixing ,fabrication and installation of gates with required MS sheet angle, channel as per approved drawing and design. | 129.22 | Sqm | 43,375 ₹56,04,830.75 Lowest | 65,000 ₹83,99,170 | 70,000 ₹90,45,260 | 65,000 ₹83,99,170 | 58,000 ₹74,94,644 | 65,000 ₹83,99,170 |
| 6.00 | Electrification of Gate and Gearing for smooth operation Manually and Electric Both including Panels Box, Complete Wiring ,Approved Make Motor 05 HP Capacity and Gear Box complete All Specifications | 10 | Each | 2,60,250 ₹26,02,500 Lowest | 3,00,000 ₹30,00,000 | 3,50,000 ₹35,00,000 | 3,00,000 ₹30,00,000 | 3,00,000 ₹30,00,000 | 3,00,000 ₹30,00,000 |
| 7.00 | Credit of earth available from excavation | 1,299.81 | cum | 18 ₹-23,396.58 Lowest | 18 ₹-23,396.58 Lowest | 19 ₹-24,696.39 | 20 ₹-25,996.2 | 18 ₹-23,396.58 Lowest | 18 ₹-23,396.58 Lowest |
| 8.00 | Gate and gearing for head regualtor | 5.77 | Sqm | 43,375 ₹2,50,273.75 Lowest | 65,000 ₹3,75,050 | 70,000 ₹4,03,900 | 50,000 ₹2,88,500 | 70,000 ₹4,03,900 | 65,000 ₹3,75,050 |
Tender Value
₹16.4 Cr
EMD Value
₹32.7 L
Closing Date
15 Sept 2026, 5:00 pmClosed
ARUN MUNJAL
Rohtak W.S. Divn. Rohtak
Reconstruction / Construction of Various Structures from RD 124000 To 156014 Of Bhalaut Sub Branch
2026_HRY_545055_1
202621CAFF79 4B10 4B3D A517 CDC2C13496F5125IRR
Open Tender
Civil Works
Works
360 days
KILOI DOPANA KILOI KHAS LADHOT Rohtak
3 documents required · 3 mandatory
₹20,000
₹32.7 L
Yes
Room No. 220 1st Floor, Sinchai Bhawan
18 Sept 2026
2 Sept 2026
16 Sept 2026
2 Sept 2026
15 Sept 2026
2 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Credit of old steel bars | 1 | Quintal | 3,000 | ₹2,997 |
| 2 | credit of bricks | 301.25 | cum | 880 | ₹2,65,100 |
| 3 | credit of bricks and B.Bats available from dismantling of Brick Masonry | 0.8 | cum | 880 | ₹704 |
| 4 | Fabrication (erection and commissioning of wheel assembly with GM bush of size 400*150 complete in all respect pf Engineer in charger | 40 | NO. | 40,000 | ₹16,00,000 |
| 5 | NS Item -providing, fixing ,fabrication and installation of gates with required MS sheet angle, channel as per approved drawing and design. | 0.2 | Sqm | 50,000 | ₹9,950 |
| 6 | Electrification of Gate and Gearing for smooth operation Manually and Electric Both including Panels Box, Complete Wiring ,Approved Make Motor 05 HP Capacity and Gear Box complete All Specifications | 10 | Each | 3,00,000 | ₹30,00,000 |
| 7 | Credit of earth available from excavation | 1,299.81 | cum | 18 | ₹23,396.58 |
| 8 | Gate and gearing for head regualtor | 5.77 | Sqm | 50,000 | ₹2,88,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_624608.xls
BOQ • 0.45 MB
OT0149577.pdf
Other Document • 0.74 MB
Corri.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .