Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹3.1 L+₹837.93 (0.27%)Rejected-Finance VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | 2 | Rejected-Finance Quoted amount is more than L1 bidder | |
| 3 | 3₹3.1 L+₹2,184.99 (0.70%)Rejected-Finance GOPALMATH DURGAPUR DIST PASCHIM BARDHAMAN PIN 713217 W B | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713217 | 3 | Rejected-Finance Quoted amount is more than L1 bidder |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
10 Apr 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
ECL Sonepur Bazari Area
Erection/making of 04 no. Mast light at newly constructed Sonepur Rehab Site at 08 (eight) nos. Mandir Complex under S.B. Area.
2023_ECL_276718_1
GM/SBA/EnM/e-tender/2022-23/ 811
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
ECL Sonepur Bazari Area
Please refer tender documents
6 documents required · 6 mandatory
₹3,800
20 Nov 2023
30 Mar 2023
12 Apr 2023
31 Mar 2023
10 Apr 2023
31 Mar 2023
31 Mar 2023 - 3 Apr 2023
Amount
Item Description/ Heading
Material Cost
Material cost for erection 09/12 mtrs long steel tubular pole (for 4 nos. Mast Light)
Meterial cost for supply and erection of nut, bolt,flats febrication, hoisting and erection of clamps. (for 4 nos. Mast Light)
Material cost for supply, febrication, hoisting & erection of bracket (for 4 nos. Mast Light)
Material cost for Supply and fixing of 200 W LED Flood Light (for 4 nos. Mast Light)
Material cost for supply & fixing of 10 sq mm 3 core copper cable (1.1 KV Grade)(for 4 nos. Mast Light)
Labour Cost:-
Labour cost for erection 09/12 mtrs long steel tubular pole (for 4 nos. Mast Light)
Labour cost for erection of nut, bolt,flats febrication, hoisting and erection of clamps. (for 4 nos. Mast Light)
Labour cost febrication, hoisting & erection of bracket (for 4 nos. Mast Light)
Labour cost for fixing of 200 W LED Flood Light (for 4 nos. Mast Light)
Material cost for fixing of 10 sq mm 3 core copper cable (1.1 KV Grade) (for 4 nos. Mast Light)
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
JAY MAA DAL DALI KALI
EVERGREEN ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_286474.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .