| 1 | L1₹4.1 CrAccepted-AOC | ₹4.1 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹4.3 Cr+₹18.6 L (4.54%)Rejected-AOC H NO 685 NEAR GOVT SR SEC SCHOOL PAKASMA ROHTAK HR 124401 | PAKASMA | ROHTAK | HARYANA | 124401 | ₹4.3 Cr+₹18.6 L (4.54%) | L2 | Rejected-AOC ok |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
13 May 2022, 3:00 pmClosed
Executive Engineer
W/S Feeder Division, Rohtak
Re-construction Head Regulator cum V.R. Bridge at RD 156014 of JLN Feeder.
2022_HRY_220075_1
2146-65/2-A
Open Tender
Civil Works - Bridges
Item-rate/Agreement basic
270 days
Rohtak
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹7.4 L
Yes
Rohtak
30 Aug 2022
7 May 2022
16 May 2022
7 May 2022
13 May 2022
7 May 2022
10 May 2022
Amount
Dismantling steel work upto height of 5 Mtr. in built up sections in angles, tees, flats and channels including all all gusset plates, bolts, nuts, beading etc including dismembering as per old HSR Item No. 8.22 (a)
Demolishing brick work in cement mortar as per old HSR Item No. 8.5 (b)
Demolishing R.C.C. reinforced cement concrete with cleaning and straightening and cutting of bars if required as per old HSR Item No. 8.6 (a)
Demolishing cement concrete plain 1:2:4 mi as per old HSR Item No. 8.6 (d)
Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete as per HSR Item No. 4.33 (for bandh)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil as per HSR Item No. 4.14.1
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more as per HSR Item No. 6.33.6, 6.34.6
RCC Grade M25 Height up to 5m as per HSR Item No. 27.27.1.1
PCC Grade M15 (with concrete Mixer) Height up to 5m as per HSR Item No. 27.5
Brick masonry work in 1:3 in sub-structure including scaffolding complete excluding pointing and plastering, as per drawing and MoRT&H Specifications 1300 and 2200 as per HSR Item No. 27.1
Pointing with cement mortar (1:3 ) on brick work in substructure as per MoRT&H Specifications as per HSR Item No. 27.2
Providing and fixing in position 12 mm thick bitumen impregnated per fibre board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints as per HSR Item No. 6.58
Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 75 mm diameter as per HSR Item No. 9.57.1
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRT&H Specifications as per HSR Item No. 27.15
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per HSR Item No. 4.32
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete On concrete work as per HSR Item No. 11.73.2
Credit of Steel
Credit of Brick Work
Credit of Surplus Soil HSR RM079
VIJAY CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .