Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Accepted-Technical | Accepted-Technical OK |
| 3 | Accepted-Technical VEERENDRA KUMAR GUPT 00 0 NAIGNAJ BADSHAHPUR MUNGRA MACHHLISHAHAR JAUNPUR UTTAR PRADESH 222202 | JAUNPUR | UTTAR PRADESH | 222202 | Accepted-Technical OK |
Tender Value
₹23.4 L
EMD Value
₹2.3 L
Closing Date
18 May 2026, 2:00 pmClosed
EO
NPP MUNGRA BADSHAHPUR
WORK 16
2026_DOLBU_1142721_1
178
Open Tender
Civil Works
Percentage
NPP MUNGRA BADSHAHPUR
WORK 16
2 documents required · 2 mandatory
₹2,832
Yes
EO
₹2.3 L
Yes
22 May 2026
27 Apr 2026
18 May 2026
27 Apr 2026
18 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M150 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes.DSR-2023, 6.4.1. | 1 | Cum | 6,868.1 | ₹6,861.23 |
| 2 | 12mm thick plaster in 1:3 cement and coarse sand mortar. All complete. DSR-2023, 13.4.1. | 1 | SQM | 262.65 | ₹262.39 |
| 3 | P/Finting plubring work all complete. | - | JOB | 99,000 | - |
| 4 | Providing and fixing 110mm dia rigid PVC pipe of approved quality. All complete. (as per MR) | - | JOB | 10,000 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers DSR 2023 5.9.5 | - | SQM | 541.25 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts .DSR 2023 5.9.6 | - | SQM | 706.56 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. DSR 2023 5.9.3 | 1 | SQM | 681.53 | ₹680.85 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).DSR-2023, 5.2.2 | 1 | Cum | 7,976.92 | ₹7,968.94 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).DSR-2023, 5.3 | - | Cum | 8,456.54 | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.DSR-2023, 5.22A.6 | - | kg | 79.27 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_2134008.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .