| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC 1ST LOWEST | |
| 2 | L2₹12.0 L+₹2.8 L (29.9%)Rejected-AOC MIRDHAN KIRATPUR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | L2 | Rejected-AOC REJECTED |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
25 Jan 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
OFFICE EE ID BIJNOR
LOT 12-Repair of VRB at km 35.472 ,and Fall at KM 35.652 and Balla Piling work on Right and LEFT Bank from km.35.670 to km. 35.720 at Nehtaur Branch.
2021_UPIDC_546944_12
07/EE/2020-21
Open Tender
Civil Works - Canal
Item Rate
60 days
BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹1.4 L
15 Mar 2021
19 Jan 2021
27 Jan 2021
19 Jan 2021
25 Jan 2021
19 Jan 2021
90 days
Amount
Supplying and filling Euclyptus ballie 12 cm to 15 cm dia including fitting and labour, T&p etc complete.
Bracing of ballies for Screening including all fitting labour t&p Complete.
Pilling Euclyptus ballie 12 cm to 15 cm dia in silty and Sandy Strata Upto 6M depth in Water.
Supplying and filling Sada bahar jhahu/ jhankar and Placing in Position including carriage upto 1.00 km.
Filling empty cement bags with Ordinary earth and Placing in Position Within 60m Distance.
Earth work in filling in ordinary Soil With dressing and Manual compaction i/c 1.50 Meter lift and 1.00 km lead by power transport, also i/c all cost of labour, material and T&P required for proper , completion of Work.
1:4 cm Brick work in parappet of V.R.B.Pannel,Crest wall and wing wall. Including all labour T & P etc complete.
1:2 CM Cement Pointing (Deep struck) in parappet of V.R.B.Pannel,Crest wall and wing wall. Including all cost of labour T & P etc complete.
Cement concrete 1:2:4 in top of Crest wall and Ramp of Fall including all cost of material, labour T & P etc complete.
Gravel Filter in Sleepers Including all cost of material, labour T & P etc complete.
Relaying Dry Boulder pitching Including all cost of material, labour T & P etc complete.
Laying 5Kg. To 20Kg Loose Boulder Including all cost of material, labour T & P etc complete.
arif husain
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .