| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.8 LAccepted-AOC 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | ₹33.8 L Quoted ₹39.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹41.4 LRejected-AOC LOCATION TAMIL NADU TN | ₹41.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI VINAYAKA ENTERPRISES | VEL ENGINEERING |
|---|---|---|---|---|---|
| 1.00 | Charges for cleaning of oil strainer by lifting the top cover. Lifting ofstrainer, Cleaning of strainer with diesel, air refixing and tightening the top cover. | 180 | OPN | 5,50,800 ₹6.5 L | 5,29,200 ₹6.2 L |
| 2.00 | Charges for cleaning of pumps pipes lines and oil heating station in unit I to V 10 Nos. Heavy oil pumps, 6 Nos. Light oil pumps, 3 Nos. Sump pumps, 2 Nos Light oil transfer pumps, related light oil lines, steam lines checking the all bolts tightness for all the pumps, heater valves. Heavy oil leakage through valve gland from 10 Nos. pumps has to be collected periodically and poured in to sump. This work has to be performed regularly every day. | 350 | OPN | 9,06,500 ₹10.7 L | 8,71,500 ₹10.3 L |
| 3.00 | Charges for checking the oil leakages and condition and position of heavy oil pumping pipe line from IOC to FOPH (Ø of pipe 450 mm and 300 mm) approx. 1400 mtr and removing the inflammable material if any near the furnace oil pipe line day & night. Checking the oil leakages and condition and Position of heavy oil pumping pipe line from FOPH to Heating station I & II Unit – I, II & III approx. 650 mtr. cleaning and removal of inflammable material like cotton waste, wooden pieces, dry leaves and twigs in and around the furnace oil I & II and high speed diesel tank day & Night. Checking and cleaning of Air Vent pipe 3 nos at the top of furnace oil tank height of tank 16mtrs. (approx) and checking and cleaning of air vent pipe 3 nos at the top of HSD tank height of tank 12 mtrs. (approx.)Checking the tightness of flange joints, valve flange joints, gland bolt joints. Checking the PRDS outlet steam for heating station if any above the normal quantity control the steam by steam trap adjustment at FOPH – II. | 350 | OPN | 20,26,500 ₹23.9 L | 19,46,000 ₹23.0 L |
| 4.00 | Charges for dismantling and re-fixing of steam inlet and outlet pipes, heater cover and steam coils of furnace oil heater of unit IV & V including cost of hire charges for T & P etc. complete. | 16 | Nos | 2,26,720 ₹2.7 L | 2,18,080 ₹2.6 L |
| 5.00 | Charges for complete cleaning inside of steam coils with steel wire brush and outside of the steam coil by manually and with diesel including hire charges for T&P and cost of consumables etc., complete. | 16 | Nos | 4,28,000 ₹5.1 L | 4,11,680 ₹4.9 L |
Tender Value
Refer Docs
EMD Value
₹27,900
Closing Date
25 Dec 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD FOPH Attending preventive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and Storage Tanks heavy oil IOC pumping lines and supply lines of U
2025_EB_630868_1
CE/SE/O/TTPS/Spec.No.28/26-27
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹27,900
Yes
23 Mar 2026
11 Dec 2025
26 Dec 2025
11 Dec 2025
25 Dec 2025
11 Dec 2025
Charges for cleaning of oil strainer by lifting the top cover. Lifting ofstrainer, Cleaning of strainer with diesel, air refixing and tightening the top cover.
Charges for cleaning of pumps pipes lines and oil heating station in unit I to V 10 Nos. Heavy oil pumps, 6 Nos. Light oil pumps, 3 Nos. Sump pumps, 2 Nos Light oil transfer pumps, related light oil lines, steam lines checking the all bolts tightness for all the pumps, heater valves. Heavy oil leakage through valve gland from 10 Nos. pumps has to be collected periodically and poured in to sump. This work has to be performed regularly every day.
Charges for checking the oil leakages and condition and position of heavy oil pumping pipe line from IOC to FOPH (Ø of pipe 450 mm and 300 mm) approx. 1400 mtr and removing the inflammable material if any near the furnace oil pipe line day & night. Checking the oil leakages and condition and Position of heavy oil pumping pipe line from FOPH to Heating station I & II Unit – I, II & III approx. 650 mtr. cleaning and removal of inflammable material like cotton waste, wooden pieces, dry leaves and twigs in and around the furnace oil I & II and high speed diesel tank day & Night. Checking and cleaning of Air Vent pipe 3 nos at the top of furnace oil tank height of tank 16mtrs. (approx) and checking and cleaning of air vent pipe 3 nos at the top of HSD tank height of tank 12 mtrs. (approx.)Checking the tightness of flange joints, valve flange joints, gland bolt joints. Checking the PRDS outlet steam for heating station if any above the normal quantity control the steam by steam trap adjustment at FOPH – II.
Charges for dismantling and re-fixing of steam inlet and outlet pipes, heater cover and steam coils of furnace oil heater of unit IV & V including cost of hire charges for T & P etc. complete.
Charges for complete cleaning inside of steam coils with steel wire brush and outside of the steam coil by manually and with diesel including hire charges for T&P and cost of consumables etc., complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_754433.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid