Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Finance | -36.99% | ₹6.3 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 LAdmitted-Finance | -33.61% | ₹6.6 L | L2 | Admitted-Finance |
| 3 | L3₹6.7 LAdmitted-Finance | -33.11% | ₹6.7 L | L3 | Admitted-Finance |
| 4 | L4₹7.1 LAdmitted-Finance | -29.10% | ₹7.1 L | L4 | Admitted-Finance |
| 5 | L5₹7.2 LAdmitted-Finance | -28.10% | ₹7.2 L | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
7 May 2026, 4:00 pmClosed
Er ranjit singh
OFFICE OF THE XEN PWD RNB DIVISION RAMBAN
BOQ
2026_PWDJK_309190_6
E-NIT No. 12 of 2026-27 Dated. 30-04-2026
Open Tender
Civil Works
20 days
Cganderkote
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN PWD RNB DIVISION RAMBAN
₹20,000
Yes
12 May 2026
2 May 2026
8 May 2026
2 May 2026
7 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :90% OR= 10% | 9.72 | Cum | 523.85 | ₹5,091.82 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 48.18 | Cum | 5,202.9 | ₹2,50,675.72 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6 with 20% bouldr (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 22.32 | Cum | 4,774.47 | ₹1,06,566.17 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 142.4 | Sqm | 286.35 | ₹40,776.24 |
| 0.0 | 12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) | 74.4 | Sqm | 266.2 | ₹19,805.28 |
| 0.0 | Finishing wall with premium acrylic smooth exterior paint with silicone additives of required shade on New work (two or more coats applied @ 1.43 liter/10sqm over and including priming coat of water exterior paint applied @ 2.20kg/10sqm) | 74.4 | Sqm | 178.45 | ₹13,276.68 |
| 0.0 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colou r& pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 16.93.1 60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern | 574.16 | Sqm | 875.95 | ₹5,02,935.45 |
| 0.0 | Carriage of Sand from source to site of work by Mechanical transport including Loading /Unloading complete for an Avg. distance 110km by MT | 30.97 | Cum | 1,403.54 | ₹43,467.63 |
| 0.0 | Carriage of Stone aggregrate below 40mm from source to site of work by Mechanical transport including Loading /Unloading complete for an Avg. distance 10 km by MT | 15.89 | Cum | 279.04 | ₹4,433.95 |
| 0.0 | Carriage of Stone aggregrate above 40mm from source to site of work by Mechanical transport including Loading /Unloading complete for an Avg. distance 10 km by MT | 42.88 | Cum | 303.34 | ₹13,007.22 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_1001100.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid