| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹10.3 L+₹1.2 L (13.2%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹11,100
Closing Date
20 Feb 2023, 2:00 pmClosed
SE Civil TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Providing culvert in 275 N road near storm water pump house at TTPS
2023_EB_284381_1
SE Civil TTPS Spec.No.218 2022 2023
Open Tender
Civil Works - Others
Works
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,100
Yes
22 Feb 2023
27 Jan 2023
21 Feb 2023
27 Jan 2023
20 Feb 2023
27 Jan 2023
Amount
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m and disposing the excess excavated earth 1Km. away from the site including cost of all materials labours, lead, lift, etc. complete.
Providing PCC 1:4:8 using OP/PP cement with 40m size machine HBG metal including cost of all materials, labours, lead, lift, etc., complete.
R.R. Masonry in C.M.1:6 including cost of all materials, labours, lead, lift, curing, etc. complete.
Pointing with C.M 1:6, flush pointing for R.R. masonry including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Providing centering and shuttering arrangements for placing concrete using steel members and wooden props including cost of all materials, labour, lead, lift etc., complete.
Providing brick work in CM 1:5 using chamber burnt bricks, including cost of all materials, labours, lead, lift, etc. complete.
Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete.
SEETHALAKSHMI ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .