| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 CrAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹25.2 Cr+₹15.8 L (0.63%)Rejected-AOC 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | L2 | Rejected-AOC 2nd Lowest | |
| 3 | L3₹26.1 Cr+₹1.1 Cr (4.27%)Rejected-AOC | L3 | Rejected-AOC 3rd Lowest | |
| 4 | L4₹26.3 Cr+₹1.2 Cr (4.89%)Rejected-AOC C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | L4 | Rejected-AOC 4th Lowest |
| Sl No | Description | Qty | Unit | M/S ARUN CONSTRUCTION L3 | Shri Krishna Construction Projects Pvt Ltd L4 | MSA CONSTRUCTION PRIVATE LIMITED L1 | VELJI RATNA SORATHIA INFRA PVT. LTD L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work cutting in soil for making of Canal section including cost of labour charges, dressing of canal section required quantity for filling in embankment including lead up to 30 m and all lift, T&P, Labour, etc. required for proper completion of work as per directon of engineer- in- charge. | 3,88,924.12 | Cum | 62 ₹2,41,13,295.44 | 50 ₹1,94,46,206 Lowest | 69.26 ₹2,69,36,884.55 | 50 ₹1,94,46,206 Lowest |
| 2.00 | Excavation in canal other rock (Hard Rock) by controll blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | 57,906.02 | Cum | 380 ₹2,20,04,287.6 | 300 ₹1,73,71,806 Lowest | 458.75 ₹2,65,64,386.68 | 300 ₹1,73,71,806 Lowest |
| 3.00 | Excavating in canal soft rock by controll blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | 1,08,875.74 | Cum | 200 ₹2,17,75,148 Lowest | 220 ₹2,39,52,662.8 | 398.84 ₹4,34,24,000.14 | 220 ₹2,39,52,662.8 |
| 4.00 | Cutting Soil Used in Earth work filling by Power transport where execavated earth used from cutting section of canal with a lead up to 1 km including mechanical compaction with watering to bring it at OMC to achieve minimum 95% dry density of excavated earth with all lift and T&P etc required for proper completion of work as per direction of engineer-in charge. | 81,572.21 | Cum | 125 ₹1,01,96,526.25 | 81.5 ₹66,48,135.12 | 113.95 ₹92,95,153.33 | 75 ₹61,17,915.75 Lowest |
| 5.00 | Earth Work in Filling by power transport with lead up to 2.00 km including cost of excavation, loding, unloding, mechanical compaction with watering to bring it at OMC to Achieve minimum 95% Dry density of excavated earth and cost of labour charges, dressing etc with including all lift for proper completion of work as per direction of Engineer - in-charge. . | 1,11,971.42 | Cum | 160 ₹1,79,15,427.2 | 140.5 ₹1,57,31,984.51 Lowest | 214.2 ₹2,39,84,278.16 | 140.5 ₹1,57,31,984.51 Lowest |
| 6.00 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. | 32,454.77 | Cum | 200 ₹64,90,954 | 185 ₹60,04,132.45 Lowest | 238.19 ₹77,30,401.67 | 185 ₹60,04,132.45 Lowest |
| 7.00 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit 4.75 to 20mm. including cost of all material, labour, T&P, lead & lift with mechanical mixing & mechanical vibration and placing of concrete, roylity and all taxes etc. for proper completion of work. | 2,230.21 | Cum | 7,200 ₹1,60,57,512 | 8,570 ₹1,91,12,899.7 | 4,700.16 ₹1,04,82,343.83 Lowest | 8,100 ₹1,80,64,701 |
| 8.00 | Laying C.C. M-20 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone dalla grit 4.75mm to 20mm size including all lead and lift with mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 881.6 | Cum | 8,100 ₹71,40,960 | 8,710 ₹76,78,736 | 5,558.5 ₹49,00,373.6 Lowest | 8,290 ₹73,08,464 |
| 9.00 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75 to 20mm. including cost of all material, labour, T&P, lead & lift, mixing & placing with batching plant, concrete pump & mechanical vibration, roylity and all taxes etc. but excluding cost of steel reinforcement for proper completion of work. | 7,701.55 | Cum | 8,400 ₹6,46,93,020 | 8,935 ₹6,88,13,349.25 | 5,595.52 ₹4,30,94,177.06 Lowest | 8,500 ₹6,54,63,175 |
| 10.00 | Random rubble stone masonery in 1:4 cement (OPC 43 grade) and coarse sand mortar including all lead and lift, materials, labour charges and T&P etc. for Proper Completion of work. | 2,910.78 | Cum | 5,000 ₹1,45,53,900 | 4,210 ₹1,22,54,383.8 | 2,547.5 ₹74,15,212.05 Lowest | 3,750 ₹1,09,15,425 |
Tender Value
Refer Docs
EMD Value
₹70.2 L
Closing Date
10 Oct 2025, 3:00 pmClosed
SE KCC Pipri Sonbhadra
Office of SE KCC Pipri Sonbhadra
Construction of canal from km0.225to9.6 B.syphon at 0.675 at 0.9 at 1.67 at 3.05 P.Syphon at 3.6 B.syphon at 4.0 Super passage at 5.7B.syphon at 8.184 at 9.5Escape at 6.465 Box culvert at 1.48 at 2.05 at 2.796 at 4.55 at 7.1 at 8.313 at 9.030 on RPBC
2025_UPIDC_1074254_1
03/SE/2025-26
Open Tender
Civil Works
Item Rate
365 days
Village-Kudwa, Kachnarwa, Karail, Bagesoti
please refer tender document
2 documents required · 2 mandatory
₹2,360
₹70.2 L
24 Dec 2025
16 Sept 2025
10 Oct 2025
16 Sept 2025
10 Oct 2025
30 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work cutting in soil for making of Canal section including cost of labour charges, dressing of canal section required quantity for filling in embankment including lead up to 30 m and all lift, T&P, Labour, etc. required for proper completion of work as per directon of engineer- in- charge. | 3,88,924.12 | Cum | 97 | ₹3,77,25,639.64 |
| 2 | Excavation in canal other rock (Hard Rock) by controll blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | 57,906.02 | Cum | 642.5 | ₹3,72,04,617.85 |
| 3 | Excavating in canal soft rock by controll blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | 1,08,875.74 | Cum | 558.6 | ₹6,08,17,988.36 |
| 4 | Cutting Soil Used in Earth work filling by Power transport where execavated earth used from cutting section of canal with a lead up to 1 km including mechanical compaction with watering to bring it at OMC to achieve minimum 95% dry density of excavated earth with all lift and T&P etc required for proper completion of work as per direction of engineer-in charge. | 81,572.21 | Cum | 159.6 | ₹1,30,18,924.72 |
| 5 | Earth Work in Filling by power transport with lead up to 2.00 km including cost of excavation, loding, unloding, mechanical compaction with watering to bring it at OMC to Achieve minimum 95% Dry density of excavated earth and cost of labour charges, dressing etc with including all lift for proper completion of work as per direction of Engineer - in-charge. . | 1,11,971.42 | Cum | 300 | ₹3,35,91,426 |
| 6 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. | 32,454.77 | Cum | 333.6 | ₹1,08,26,911.27 |
| 7 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit 4.75 to 20mm. including cost of all material, labour, T&P, lead & lift with mechanical mixing & mechanical vibration and placing of concrete, roylity and all taxes etc. for proper completion of work. | 2,230.21 | Cum | 6,582.86 | ₹1,46,81,160.2 |
| 8 | Laying C.C. M-20 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone dalla grit 4.75mm to 20mm size including all lead and lift with mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 881.6 | Cum | 7,785.02 | ₹68,63,273.63 |
| 9 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75 to 20mm. including cost of all material, labour, T&P, lead & lift, mixing & placing with batching plant, concrete pump & mechanical vibration, roylity and all taxes etc. but excluding cost of steel reinforcement for proper completion of work. | 7,701.55 | Cum | 7,836.86 | ₹6,03,55,969.13 |
| 10 | Random rubble stone masonery in 1:4 cement (OPC 43 grade) and coarse sand mortar including all lead and lift, materials, labour charges and T&P etc. for Proper Completion of work. | 2,910.78 | Cum | 3,567.93 | ₹1,03,85,459.29 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.78 MB
BOQ_1961660.xls
BOQ • 0.36 MB
Tenderdocumentrpbc.pdf
Tender Documents • 7.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .