| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance | ₹7.8 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 LAdmitted-Finance | ₹8.0 L | L2 | Admitted-Finance |
| 3 | L3₹8.4 LAdmitted-Finance | ₹8.4 L | L3 | Admitted-Finance |
| 4 | L4₹8.4 LAdmitted-Finance | ₹8.4 L | L4 | Admitted-Finance |
| 5 | L5₹9.1 LAdmitted-Finance | ₹9.1 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s VEENUS CONSTRUCTION L3 | AZEEM CONSTRUCTIONS L7 | M/S SHAKEEL RAJA L4 | Bright and Raident Group L1 | M/S FAROOQ BUILDERS L6 | ROUF AHMAD SHAH L5 | GUROO ELECTRICALS L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, installation, testing, commissioning including Loading, Transportation , insurance, Unloading, Carriage and Delivery at Site of 250 kVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2,(Copper wound) , ( redesignated as Level 1 ) and with LV Cable Box having detachable Al. Gland plate. Including return of old DT to divisional stores Anantnag | 1 | No | 5,85,000 ₹5.8 L | 5,90,000 ₹5.9 L | 5,50,000 ₹5.5 L | 5,10,000 ₹5.1 L | 5,90,000 ₹5.9 L | 5,75,000 ₹5.8 L | 5,30,000 ₹5.3 L |
| 2.00 | Supply,installation,testing,commissioning of 11 kV, G.O AB Switch , 3-phase, 3-Pole, 200A | 1 | Set | 12,000 ₹12,000 | 11,000 ₹11,000 | 9,000 ₹9,000 | 9,500 ₹9,500 | 9,000 ₹9,000 | 8,200 ₹8,200 | 8,500 ₹8,500 |
| 3.00 | Supply,installation,testing,commissioning of 11 kV Horn Gap Fuse Set 3-Phase, 3-Pole, 200Amp. | 1 | Set | 3,500 ₹3,500 | 4,000 ₹4,000 | 5,000 ₹5,000 | 3,000 ₹3,000 | 8,500 ₹8,500 | 3,500 ₹3,500 | 2,800 ₹2,800 |
| 4.00 | Supply,installation,testing,commissioning of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type Heavy Type | 1 | Set | 3,500 ₹3,500 | 4,000 ₹4,000 | 2,500 ₹2,500 | 5,000 ₹5,000 | 10,100 ₹10,100 | 2,500 ₹2,500 | 2,200 ₹2,200 |
| 5.00 | Providing and Fixing of G.I.channel Iron ISMC100x50x6mm) with 50X8 mm back clamps without drilling/punching holes in the poles.. | 56 | Kg | 112 ₹6,272 | 115 ₹6,440 | 110 ₹6,160 | 117 ₹6,552 | 145 ₹8,120 | 110 ₹6,160 | 115 ₹6,440 |
| 6.00 | Providing and Fixing of GI channel Iron ISMC 75x40x6 mm) with 50X8 mm back clamps without drilling/punching holes in the poles including transformer belt | 144 | Kg | 112 ₹16,128 | 115 ₹16,560 | 110 ₹15,840 | 117 ₹16,848 | 145 ₹20,880 | 110 ₹15,840 | 115 ₹16,560 |
| 7.00 | Providing and fixing of Angle Iron 45x45x5 mm 10 ft long duly painted for Transformer Belt and sporters | 100 | Kg | 80 ₹8,000 | 115 ₹11,500 | 90 ₹9,000 | 75 ₹7,500 | 145 ₹14,500 | 110 ₹11,000 | 90 ₹9,000 |
| 8.00 | Supply, Laying Testing and commissioning of PVC Cable 320 mm sq. of standard make with ISI Insulation. | 44 | mtr | 550 ₹24,200 | 800 ₹35,200 | 900 ₹39,600 | 650 ₹28,600 | 1,290 ₹56,760 | 480 ₹21,120 | 500 ₹22,000 |
| 9.00 | Providing and fixing of Al thimbles of 185 sq mm | 8 | No | 100 ₹800 | 150 ₹1,200 | 100 ₹800 | 150 ₹1,200 | 150 ₹1,200 | 60 ₹480 | 50 ₹400 |
| 10.00 | Supplying and installation of sub station earthing by excavation of earth pit of dia 650mm and depth 3000mm, installation of earthing pipe of 40mm nominal bore and 4 mm wall thickness and length 2.5m long as per IS 1239. GI Strip for neutral earthing of size 25mm x 3 mm for connection of Transformer Body, GO Set and Lightning Arrestor as per IS 2629/85, GI Nuts and Bolts, refilled with earth enhancement materials and earth chamber made of brick messonary with RCC Slab cover | 3 | No | 1,300 ₹3,900 | 1,500 ₹4,500 | 2,500 ₹7,500 | 1,700 ₹5,100 | 1,950 ₹5,850 | 2,100 ₹6,300 | 1,500 ₹4,500 |
Tender Value
₹12.3 L
EMD Value
₹24,680
Closing Date
2 Feb 2026, 4:00 pmClosed
EXECUTIVE ENGINEER ED ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER ED ANANTNAG
Augmentation of 100 KVA to 250 KVA Substation at GDC Women Anantnag under PMKKKY Grants.
2026_PDD_301045_1
79/EDA OF 2025-26
Open Tender
Electrical Works
7 days
ANANTNAG
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
EXECUTIVE ENGINEER ED ANANTNAG
₹24,680
4 Feb 2026
21 Jan 2026
3 Feb 2026
21 Jan 2026
2 Feb 2026
21 Jan 2026
21 Jan 2026 - 2 Feb 2026
Supply, installation, testing, commissioning including Loading, Transportation , insurance, Unloading, Carriage and Delivery at Site of 250 kVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2,(Copper wound) , ( redesignated as Level 1 ) and with LV Cable Box having detachable Al. Gland plate. Including return of old DT to divisional stores Anantnag
Supply,installation,testing,commissioning of 11 kV, G.O AB Switch , 3-phase, 3-Pole, 200A
Supply,installation,testing,commissioning of 11 kV Horn Gap Fuse Set 3-Phase, 3-Pole, 200Amp.
Supply,installation,testing,commissioning of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type Heavy Type
Providing and Fixing of G.I.channel Iron ISMC100x50x6mm) with 50X8 mm back clamps without drilling/punching holes in the poles..
Providing and Fixing of GI channel Iron ISMC 75x40x6 mm) with 50X8 mm back clamps without drilling/punching holes in the poles including transformer belt
Providing and fixing of Angle Iron 45x45x5 mm 10 ft long duly painted for Transformer Belt and sporters
Supply, Laying Testing and commissioning of PVC Cable 320 mm sq. of standard make with ISI Insulation.
Providing and fixing of Al thimbles of 185 sq mm
Supplying and installation of sub station earthing by excavation of earth pit of dia 650mm and depth 3000mm, installation of earthing pipe of 40mm nominal bore and 4 mm wall thickness and length 2.5m long as per IS 1239. GI Strip for neutral earthing of size 25mm x 3 mm for connection of Transformer Body, GO Set and Lightning Arrestor as per IS 2629/85, GI Nuts and Bolts, refilled with earth enhancement materials and earth chamber made of brick messonary with RCC Slab cover
Supply,erection, testing, commissioning including Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 9 Mtr. Long ST Poles (410, SP-33) with pit excavation, refilling the pit with soil, boulders.
Providing and fixing of GI Channel Iron V shaped X arms with F top complete and 2 No angle Iron braces with fittings complete (21 Kg each)
Providing and Fixing of 11KV Polymeric Pin Insulator 12KV,5KN Lighting Impulse 75kv Positive and 80KV Negative Creepage distance 320mm.
Supplying and fixing of Galvanized Nuts and Bolts of sizes.
Supply & Providing of LT Distribution Box for 250 kVA DTR with 400 Amp MCCB 3P 36 kA for incomer & 200 Amp MCCB 3P 16 kA 1 No. and 160 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits
Supply,Installation, testing, commissioning of 11kv HT TVM with CT Ratio 20/5, PT 11kva/sqrt 3/110 volt and 3 core cable(8mtr 11 kV as per the spacefication mentioned in the NIT)
Providing & fixing of Earthing Complete for Poles by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm
Supply and Painting of each Pole 1 coat red oxide paint and 2 or more coats of aluminium paint so as to obtain even finish including Pole Marking ( 6inch x 6 inch in yellow paint and 1 inch Black Marking)
Providing and laying of Cement bottoming 1:2:4 mix as per REC standards 0.48 cum for 9 mtr poles muffing 20 cm above ground level ,including plaster and curing of concrete.
Providing and fixing of Danger Plates of standard make
Providing and fixing of Anticlimbimg devices with Clamps 2.5 kg Average
Providing and fixing of LT Spacers (3 phase 4 wire).
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.98 MB
Tendernotice_3.pdf
PDF • 18.33 MB
Tendernotice_4.pdf
PDF • 0.84 MB
BOQ_976722.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid