Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -0.07% | ₹2.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -0.05% | ₹2.3 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
EMD Value
₹2,400
Closing Date
6 Jul 2026, 3:00 pmClosed
EXECUTIVE ENGINEER UPSIC PRAYAGRAJ
EXECUTIVE ENGINEER UPSIC PRAYAGRAJ
SUPPLY INSTALLATION AND COMMISSIONING OF 1 NOS. WATER COOLER WITH R.O/U.V AT PRIMARY SCHOOL NIJAMPUR PURAINI BLOCK CHAYAL IN ASSEMBLY CHAYAL DIST. KAUSHAMBI U.P
2026_MSME_1164864_5
680/UPSIC/PRYCIVIL/2026-27
Open Tender
Miscellaneous Works
Percentage
90 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
MDEXECUTIVE ENGINEER UPSIC PRAYAGRAJ
₹2,400
9 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation in foundation in ordinary soil including with all material labour T&P complete. | 1.28 | cum | 160 | ₹204.8 |
| 2 | P/Laying Lean Concrete in 1:6:12 mortar cement sand with 40 mm gauge brick ballast i/c all material Labour T&P etc. | 1 | cum | 3,500 | ₹3,496.5 |
| 3 | Same as item no. 2 but 8:4:1 in floor | 0.54 | cum | 3,900 | ₹2,106 |
| 4 | Brickwork in 1:4 Cement & C- sand mortar Both sides of the way i/c all material Labour T&P etc. complete. | 1.44 | cum | 5,300 | ₹7,609.1 |
| 5 | M.S. or iron work in M.S. grill and stair case railing etc. including supply of material etc. & including welding. | 68.72 | kg | 66 | ₹4,535.52 |
| 6 | S/f of 6mm china white glazed tiles in flooring and skirting..1.3 (cement and coarce sand). Finished joints with white cement slurry complete | 7.9 | sqm | 1,332 | ₹10,522.8 |
| 7 | Supply and fixing of Galvanized corrugated iron roofing 24 B.W.C. in position including supply of materials, labours T&P etc. required for | 4.75 | sqm | 1,050 | ₹4,987.5 |
| 8 | Painting with enamel paint two coats over one coats of primer coat complete. | 5 | sqm | 102 | ₹510 |
| 9 | Supply and fixing of B.R.C jali of 10x6 gauge 2.5 cm 7.5 cm size including cutting welding & waisting etc. including supply of all materials. Labor T&P etc. required for proper completion of the | 10 | sqm | 520 | ₹5,200 |
| 10 | Providing and fixing of water tank 1000 Ltr. Storage capacity makes including supply and cortege & etc. fixing. | - | nos | 6,800 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
05.pdf
Additional Documents • 0.31 MB
BOQ_2184521.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].