| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 CrAccepted-AOC NO 20 M VELAMPALAYAM MODAKURICHI ERODE 638 104 | ERODE | ERODE | TAMIL NADU | 638104 | ₹16.4 Cr Quoted ₹16.8 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹17.0 CrRejected-AOC NO 1 40 LINGAGOUNDER VALASU POONDHURAI SEMOOR POST AVAL POONDURAI VIA ERODE 638115 | ERODE | TAMIL NADU | 638115 | ₹17.0 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹17.2 CrRejected-AOC NO 801 1 M VELAMPALAYAM MODAKURICHI ERODE DISTRICT 638 104 | ERODE | TAMIL NADU | 638104 | ₹17.2 Cr | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | VSR CONSTRUCTIONS L1 | LOTUS CONSTRUCTION L2 | SRI BHANNARI AMMAN BUILDERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- 2.40m-3.30M Footing Depth.
Data worked out for 48 m3 per day/8 hrs. | 3,436 | cum | 364 ₹12,50,704 Lowest | 365 ₹12,54,140 | 366 ₹12,57,576 |
| 2.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth.
Data worked out for 64 m3 per day/8 hrs | 226 | cum | 197 ₹44,522 Lowest | 198 ₹44,748 | 197 ₹44,522 Lowest |
| 3.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. (By manual means) | 1,411 | cum | 156 ₹2,20,116 Lowest | 157 ₹2,21,527 | 158 ₹2,22,938 |
| 4.00 | Supplying and filling in foundation and basement, etc with Sand Gravel mix in ratio of 1:1 in layers of not more than 15 cm thick thoroughly mixed, well watered, rammed and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 1,249.23 | cum | 470 ₹5,87,138.1 Lowest | 470 ₹5,87,138.1 Lowest | 472 ₹5,89,636.56 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 511 | cum | 2,107 ₹10,76,677 Lowest | 2,108 ₹10,77,188 | 2,110 ₹10,78,210 |
| 6.00 | Supplying and filling 40mm gauge HBGS metal in dispersion trench around the stoneware pipe or in the leach pit or rain water harvesting pit or soak pit to the required thickness complete complying with standard specification and as directed by the departmental officers. (The rate including cost of metal filling etc. complete complying with standard specification.. | 30 | cum | 1,970 ₹59,100 Lowest | 2,000 ₹60,000 | 1,985 ₹59,550 |
| 7.00 | Supplying and filling 20mm guage HBGS metal in dispersion trench around the stoneware pipe or in the leach pit or rain water harvesting pit or soak pit to the required thickness complete complying with standard specification and as directed by the departmental officers. (The rate including cost of metal filling etc. complete complying with standard specification.. | 30 | cum | 2,500 ₹75,000 Lowest | 2,510 ₹75,300 | 2,505 ₹75,150 |
| 8.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 317 | cum | 6,090 ₹19,30,530 | 6,050 ₹19,17,850 Lowest | 6,100 ₹19,33,700 |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 155 | cum | 6,090 ₹9,43,950 | 6,050 ₹9,37,750 Lowest | 6,100 ₹9,45,500 |
| 10.00 | Providing Anti – termite treatment to soil adjacent and under building foundation, plinth periphery of the building by application of chemicals of IS 6313 part I to IV in stage to suit the progress of work consist as per the detailed specification as below (Measurements taken for the plinth area for the purpose of payment) including braking of termite mounds, making holes with crow bar, closing the holes after the treatment and including cost of chemicals, labour charges, transport & storing etc., complete and as directed by the departmental officers.(The chemical should be got approved by Executive Engineer before use on work).
Stage -1 : Spraying Anti –termite chemical solution for the foundation before laying concrete, in bottom and sides of foundation.
Stage-2 : Spraying Anti –termite chemical solution to the grade beam level, spraying has to done for to grade beam brick masonry contact with the back fill earth.
Stage-3 : Spraying Anti –termite chemical solution on the sand for the flooring before laying the flooring concrete. This treatment has to be carried out and sand filling by making holes with crow bar to a depth of 60cms and at 60cms intervals on both direction and at junction of wall and flooring throughout.
Stage -4 : Spraying Anti –termite chemical solution alround building outside by making holes with crow bar before laying plinth protection and the holes to be close after the treatment. etc., complete complying with standard specification and as directed by the departmental officer. | 1,715 | sqm | 145 ₹2,48,675 Lowest | 150 ₹2,57,250 | 155 ₹2,65,825 |
Tender Value
₹16.4 Cr
EMD Value
₹8.3 L
Closing Date
19 Feb 2026, 3:00 pmClosed
Chief Engineer
Office of Chief Engineer, PWD Projects, Chepauk, Chennai 600 005
Construction of Permanent Building for Government Arts and Science College at Manamadurai in Sivagangai District.
2026_HE_657158_1
Manamadurai_2026
Open Tender
Civil Works
Lump-sum
540 days
Manamadurai
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹8.3 L
Yes
14 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- 2.40m-3.30M Footing Depth. Data worked out for 48 m3 per day/8 hrs. | |||||
| 2Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. A). Upto 2.40m Depth. Data worked out for 64 m3 per day/8 hrs | |||||
| 3Refilling with excavated earth other than sand with an initial head load of 100 mts and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. (By manual means) | |||||
| 4Supplying and filling in foundation and basement, etc with Sand Gravel mix in ratio of 1:1 in layers of not more than 15 cm thick thoroughly mixed, well watered, rammed and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 5Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | |||||
| 6Supplying and filling 40mm gauge HBGS metal in dispersion trench around the stoneware pipe or in the leach pit or rain water harvesting pit or soak pit to the required thickness complete complying with standard specification and as directed by the departmental officers. (The rate including cost of metal filling etc. complete complying with standard specification.. | |||||
| 7Supplying and filling 20mm guage HBGS metal in dispersion trench around the stoneware pipe or in the leach pit or rain water harvesting pit or soak pit to the required thickness complete complying with standard specification and as directed by the departmental officers. (The rate including cost of metal filling etc. complete complying with standard specification.. | |||||
| 8Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | |||||
| 9Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | |||||
| 10Providing Anti – termite treatment to soil adjacent and under building foundation, plinth periphery of the building by application of chemicals of IS 6313 part I to IV in stage to suit the progress of work consist as per the detailed specification as below (Measurements taken for the plinth area for the purpose of payment) including braking of termite mounds, making holes with crow bar, closing the holes after the treatment and including cost of chemicals, labour charges, transport & storing etc., complete and as directed by the departmental officers.(The chemical should be got approved by Executive Engineer before use on work). Stage -1 : Spraying Anti –termite chemical solution for the foundation before laying concrete, in bottom and sides of foundation. Stage-2 : Spraying Anti –termite chemical solution to the grade beam level, spraying has to done for to grade beam brick masonry contact with the back fill earth. Stage-3 : Spraying Anti –termite chemical solution on the sand for the flooring before laying the flooring concrete. This treatment has to be carried out and sand filling by making holes with crow bar to a depth of 60cms and at 60cms intervals on both direction and at junction of wall and flooring throughout. Stage -4 : Spraying Anti –termite chemical solution alround building outside by making holes with crow bar before laying plinth protection and the holes to be close after the treatment. etc., complete complying with standard specification and as directed by the departmental officer. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Manamadurai_Cover1.pdf
Tender Documents • 0.98 MB
Manamadurai_Cover2.pdf
Additional Documents • 2.34 MB
BOQ_788084.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].