Tender Value
Refer Docs
Closing Date
17 May 2024, 3:00 pmClosed
MD SBSTC
SBSTC HEAD OFFICE, DURGAPUR - 713201
In house Bus body Repair/ Renovation of SBSTC Buses inside Workshop premises.
2024_SBSTC_688632_1
DDW/427/SBSTC/24 DT. 24/04/2024
Open Tender
Miscellaneous Works
Item Rate
15 days
SBSTC HEAD OFFICE, DURGAPUR - 713201
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
SBSTC HEAD OFFICE, DURGAPUR - 713201
25 Jun 2024
26 Apr 2024
20 May 2024
26 Apr 2024
17 May 2024
26 Apr 2024
6 May 2024
Full body renovation job( For Aluminum Structure):-
Full body renovation job(For Aluminum Structure):- No. of working days- 35 days (Given in NIT)
Full body renovation job( For M/S Structure):- No. of working days- 40 days (Given in NIT)
Partial body renovation job(For Aluminum Structure):- No. of working days- 30 days (Given in NIT)
Partial body renovation job( For M/S Structure):- No. of working days. – 35 days (Given in NIT)
Full body renovation job(For A.C. Coach):-No. of working days. – 45 days (Given in NIT)
Partial body renovation job(For A.C. Coach):-No. of working days. – 35 days (Given in NIT)
Full body renovation job( For Midi Bus):- No. of working days. – 25 days (Given in NIT)
Partial body renovation job( For Midi Bus):- No. of working days. – 20 days (Given in NIT)
Miscellaneous body repairing jobs:- No. of working days. (Given in NIT)
Miscellaneous body repairing jobs:- No. of working days.
Looking glass to fit. ⅛ day
Looking glass to fit after braket repairing. ¼ day
Inside LCD Monitor to fit. ¼ day
Radiator mounting braket to repair each. ¼ day
Radiator braket to repair. ¼ day
Timing cover to repair. ¼ day
Passenger gate for A/C to adjust for proper closing & opening. ½ day
Bonnet lock to fit/repair each. ¼ day
Driver gate/Passenger gate door lock to changed. ¼ day
Mudguard to repair. ½ day
Engine bonnet to be repair. ½ day
Roof top cover to repair for A/C. ½ day
Radiator grill to repair. ½ day
Radiator grill to make newly. 2 days
Driver gate to repair. 1 day
Driver gate to make newly. 2 days
Foot rest for A/C passenger seat to repair. 1 day
Passenger seat shock absorber to repair. ¼ day
Dickey lock to repair/changed. ¼ day
Gear lever bottom cover to make by rexine. ¼ day
Electrical G/check. ½ day
Wipper machine to fit. ¼
Wipper machine to fit after linkage modifyng. ½
Roof light to fit each. ¼
Head light L/S & R/S to fit & line to connect. ½
Back light L/S & R/S to fit & line to connect. ½
Electric horn to fit & line to connect. ¼
Indicator light to fit & line to connect. ¼
Combination switch to change. ¼
Stop light line to change. ¼
Louver to change for each pair. ¼
Self to change. ½
Alternator to change. ½
Floor mat pasting for A/C buses. 2 days
Valvate pasting for roof inside ceiling. 1 day
Passenger stair mat to paste for A/C buses. ½
Passenger seat clamp making for each. ¼
Back side grill to repair.½
Back side grill to make newly. 1 day
Electrical wiring newly making & fitting. 4 days
New trolly making. 2.5 days
Trolley repair. 1 day
Back restcap making (each). ⅛ days
Accidental bend chassis to repair (minor). 3 days
Accidental bend chassis to repair (major). 5 days
Stepny braket to repair. 1 day
Propeler Shaft cross member to repair. ½ day
Passenger gate with passenger stair height to shorten. 2 days
Passenger seat handle making (wooden). ⅛ day
Passenger seat handle making (M/S). ½ day
Inside body post to fit. ¼ day
Back seat platform to repair. 1 day
All passenger seat & back rest opening & fitting. 1 day
Head light portion to modify. 2 days
Front left/Right ventilator glass frame repair/newly makeup. ½ day
Window upper glass to fit. ½ day
Marcopolo window glass and rubber to change. ½ day
Marcopolo window glass sliding to change. ¼ day
Left side golai to repair. 3 days
Right side golai to repair. 3 days
Mudguard rubber to fit. ¼ day
Passenger seat frame newly making (each) (3 seater Deluxe). 2 days
Passenger seat frame newly making (each) (2 seater Deluxe). 2 days
Passenger seat frame newly making (each) (3 seater Semi deluxe). 2 days
Passenger seat frame newly making (each) (2 seater Semi deluxe). 2 days
Window glass guard M.S. flat/pipe to fit (each side). ¼ day
Body- u-bolt to tighten/change. 1 day
Front show lower both side newly made & painting. 7 days
LOKENATH AUTO BODY BULDERS
ROY BODY BUILDERS
PAL ENTERPRISE
NANDI AUTO BODY BUILDERS
ROY BODY BUILDERS
A R ENTERPRISE
LOKENATH AUTO BODY BULDERS
NANDI AUTO BODY BUILDERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .