Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical A Class Licence and Labour Not Valid. |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
12 Jun 2020, 12:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2020_PVVNV_468760_2
01/SE/EUDC-I-PRA/2020-21
Open Tender
Electrical Works
365 days
E.U.T.D.-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,310
A/c No. - 0012002100504911
₹90,000
18 Jun 2020
1 Jun 2020
12 Jun 2020
1 Jun 2020
12 Jun 2020
2 Jun 2020
Amount
Repairing works
Repairing and complete overhauling of 11 KV Schneider Electric/Stelmac and other make VCB installed at various 33/11 KV Sub Station. Any material, if required for replacement of damaged parts, while repairing the same shall have to be provided by the department, except Nut-Bolt, Washer, Packing, Wires and other rubberized parts will be provided by the contractor at his own cost.
Repairing & Overhauling of Relay installed at different 33/11 KV Sub-Stations. Any material, if required for replacement of damaged parts, while repairing the same shall have to be provided by the department, except Nut-Bolt, Washer, Packing, Wires and other rubberized parts will be provided by the contractor at his own cost.
Repairing & Overhauling of Control Panel installed at different 33/11 KV Sub-Stations. Any material, if required for replacement of damaged parts, while repairing the same shall have to be provided by the department, except Nut-Bolt, Washer, Packing, Wires and other rubberized parts will be provided by the contractor at his own cost.
Testing and overhauling works.
Power Transformers Test includes Megar value, Open circuit, short circuit, Magnetizing current, D.C. Resistance and Checking of Buchholz WTI, OTI Protection.
33 KV Switchgears Test includes Manual & Auto Tripping of Breaker by primary injection method, CT Ratio, Lubrication of Tripping Machanism, Lubrication of Machanism and minor wiring if required, is also to be done.
11 KV Switchgears Test includes Manual & Auto Tripping of Breaker by primary injection method, CT Ratio, Lubrication of Tripping Machanism and minor wiring if required, is also to be done.
M/S Kanchan and Company
M/S SHRIYA ENTERPRISES
GANGA ELECTRICALS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid