| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | ₹6.2 L Quoted ₹5.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.6 LRejected-AOC NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹5.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | ATHMIKA ENTERPRISES L1 | KR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | MS Plate 6 mm thick, sail Hard / equivalent Including Loading, transportation &Unloading. Manufacture test certificate shall be furnished. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of LRB wool, Iron & steel material and as per the direction of Engineer in charge the materials will be supplied by TANGEDCO available at stores during execution of works) | 3 | MT | 86,520 ₹2.6 L | 87,000 ₹2.6 L |
| 2.00 | Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from ESP hoppers inside / outside area. Including cost of consumables and T&P’s. | 100 | M2 | 221 ₹22,100 | 230 ₹23,000 |
| 3.00 | Charges for transporting of 6 mm M.S / Checkered plates from central stores to boiler area cutting into required size, leading, lifting, positioning on the eroded top portions of the ESP hoppers inside / outside area after removal of wornout plates above 1.5 meter level and welding the same. Including cost of consumables and T&P’s. (The Required Iron & Steel material is under Contractor Scope) | 63 | M2 | 3,457 ₹2.2 L | 3,500 ₹2.2 L |
| 4.00 | Charges for welding eroded initial welding joints in the flue gas duct at ESP hoppers inside / outside area. Including cost of consumables and T&P’s. | 170 | Mtrs | 293 ₹49,810 | 300 ₹51,000 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
5 Dec 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP bottom Hopper Reconditioning of damaged eroded portion of ESP bottom hopper patch up and strengthening works during annual overhaul for the year 2025 26
2025_EB_623725_1
CE SE MI NCTPS I 232 25 26
Open Tender
Power/Energy Projects/Products
21 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,900
Yes
27 Feb 2026
15 Nov 2025
6 Dec 2025
15 Nov 2025
5 Dec 2025
15 Nov 2025
Amount
MS Plate 6 mm thick, sail Hard / equivalent Including Loading, transportation &Unloading. Manufacture test certificate shall be furnished. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of LRB wool, Iron & steel material and as per the direction of Engineer in charge the materials will be supplied by TANGEDCO available at stores during execution of works)
Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from ESP hoppers inside / outside area. Including cost of consumables and T&P’s.
Charges for transporting of 6 mm M.S / Checkered plates from central stores to boiler area cutting into required size, leading, lifting, positioning on the eroded top portions of the ESP hoppers inside / outside area after removal of wornout plates above 1.5 meter level and welding the same. Including cost of consumables and T&P’s. (The Required Iron & Steel material is under Contractor Scope)
Charges for welding eroded initial welding joints in the flue gas duct at ESP hoppers inside / outside area. Including cost of consumables and T&P’s.
KR CONTRACTOR (BID ID -1527369)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_745794.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid