Tender Value
₹17.5 L
EMD Value
₹18,000
Closing Date
21 Jul 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT - AGAMT 2021-22 - Veppanapalli Block - Desiliting of Ivyer eri and Strengthing of bund, Construction of new sluice and new surplus weir at Chinnabomarasanapalli H/o Veppanapalli - Package No - TN-04-KRI-105
2022_RDTN_239314_1
Roc_42_2022_R10__20_06_2022
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
DRDA Krishnagiri
2 Aug 2022
5 Jul 2022
21 Jul 2022
5 Jul 2022
21 Jul 2022
5 Jul 2022
6 Jul 2022
Amount
Desiliting of Ivyer eri and Strengthing of bund, Construction of new sluice and new surplus weir at Chinnabomarasanapalli H/o Veppanapalli - Rs.17.53400/- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Formation of Fore Shore bund by dumping the earth excavated soil after bund strengthening etc complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Construction of Wing wall type Sluice
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Dismantling without damaging the near by strutures if any clearing away and carefully stacking materials useful for reuse for any thickness of wall in brick masonry in cement mortar wall under 3m High as directed by the engineer in charge of
Dismantling without damaging the near by strutures if any clearing away plain cement concrete as directed by the Engineer in charge of the works as per technical specification (B-35)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying, hositing, laying and fixing in position of RCC hume pipes NP3 Class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification
Providing cut stone rougly dressed and set in cement mortar 1:3 including fixing in position etc complete as directed by the Engineer in charge of work complying with the standard specification
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
0m to 1.10m height
1.11m to 2.20m height
2.21m to 3.29m height
Cement concrete 1 : 2 : 4 mix using 20mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Fabricating, supplying and fixing of plug and plug rod arrangements made up of ountrywood for required size alongwith M.S.Rod of 20mm dia. Of required length to suit the vent and plug size etc. including cost of rod wrought and put up and fixing
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut where ever necessary in layers including breaking clods watering and compaction using power roller to watering and compaction using power roller to atleast 95% of proctor density at OMC in each layer
Construction of Surplus Weir
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Providing stone pitching for bund at U/S Side
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Rough stone dry packing for aprons and revetments, including all cost amd conveyance of men and materials etc., all complete
Provision for Boundary stones
Provision for name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Murugesan Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .