Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance GRAM AEMANPUR DISTRICT BULANDSHAHR UTTAR PRADESH | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
20 Sept 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. E.U.D.C.-III Talkatora Power House Lucknow
S.E. E.U.D.C.-III Talkatora Power House Lucknow
34/E.U.D.C.-III/2023-24
2023_MVVNL_838117_1
34/E.U.D.C.-III/2023-24
Open Tender
Electrical Works
Item Rate
180 days
E.U.D.C.-III
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
BOB A/c No. 35140200000129 IFSC-BARBORAJLUC
₹6,000
23 Sept 2023
14 Sept 2023
21 Sept 2023
15 Sept 2023
20 Sept 2023
15 Sept 2023
Amount
Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store.
11/0.4 K.V. 400 K.V.A. Transformer.
11/0.4 K.V. 630 K.V.A. Transformer.
ABC (3X120+1X95+1X16 Sq.mm.)
Disconnection of existing 250 KVA Transformer from system shifted upto safe place to the nearest 33/11 K.V. Sub-Station of Division or required place.
Disconnection of existing 400 KVA Transformer from system shifted upto safe place to the nearest 33/11 K.V. Sub-Station of Division or required place.
Placing of 400 K.V.A. healthy Transformer from out side of yard to plinth with the help of crain and T & P.
Placing of 630 K.V.A. healthy Transformer from out side of yard to plinth with the help of crain and T & P.
Repairing of masonary type plinth of various Distribution Transformers installed in the area, along with all the material required. Shifting of the various Distribution Transformers and after completion of repairing work, replacing the Distribution Transformers with the help of crane.
Repairing and painting of the damaged wiremesh fencing of L.T. Sub-Stations in the area, along with all the required materials.
AB Conductor Stringing & sagging of 3 phase with necessary clamps, Eye hook, Suspension clamp, A-B type connector etc. on ABC New line as per RESPO specification and direction on E/I. ABC shall be supplied by department.
Earthing of 11/0.4 K.V Distribution Transformer body/neutral by way of boring and lowering of ISI marked two Nos. G.I pipe 1.5" dia 20 m deep from the ground level with solid cone at the lower end of G.I pipe. One end of G.I strip of size 50X6 mm. will be connected with neutral and body of the Transformer & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost.)
Note :- 1- All the material provided by contractor shall be as per norms of UPPCL/RESPO. 2- One carriage including loading/unloading from dump site to pit site is included in scope of work. 3- During execution of work all risk will be of the contractor. 4- Contractor will provide all T & P, vehicle and man power. 5- All the old and used material should be taken on book. 6- The quantity may be vary ±10%. 7- GST will be paid extra as legally applicable. 8-The work should be carried out under Bussiness Plan 2023-24.
SINGH ENTERPRISES
OREON PROJECTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .