| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | L1 | Accepted-Finance Lowest Bid Amount | |
| 2 | L2₹5.1 L+₹11,707.96 (2.34%)Rejected-Finance 48 VILLAGE KISHANPUR TEHSIL MAHAVAN UTTAR PRADESH VILLAGE KISHANPUR TEHSIL MAHAVAN UTTAR PRADESH MAHAVAN MAHAVAN KISHANPUR | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹5.2 L+₹23,454.86 (4.69%)Rejected-Finance | L3 | Rejected-Finance Not L1 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Jul 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, EDC-II, Mathura
Near Kali Mata Mandir, Cant, Mathura
Deposit works in the area of EDSD-Mant under EDD-Mant, Mathura
2024_DVVNL_938873_1
23/EDC-II(M)/2024-25
Open Tender
Electrical Works
Item Rate
365 days
Mathura
Please see tender documents
2 documents required · 2 mandatory
₹590
DVVNL, Agra
₹5,000
14 Aug 2024
16 Jul 2024
23 Jul 2024
16 Jul 2024
23 Jul 2024
16 Jul 2024
Amount
Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 9/11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 16 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends
Carriage of 25 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends
Carriage of 63/100 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends
Carriage of 250 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends
Carriage of 11 KV XLPE Cable size 3x70/3x120 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of 11 KV XLPE Cable size 3x185/3x300 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of Arial Bunch Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying of 11 KV XLPE Cable size 3x70/3x120 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
Laying of 11 KV XLPE Cable size 3x185/3x300 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
Filing of cable box as suitable size as per direction of supervising engineer.
filing of Straight through as suitable size as per direction of supervising engineer.
Chopping of Tree branches to Clear the route properly.
Mounting of 16 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Mounting of 25 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Mounting of 63/100 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Cutting of CC Road for making depth foundation for erection of pole.
Installation of 11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Mathura to Site of work.)
Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Mathura to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms.
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
Fixing of Distribution Box on erected PCC Pole.
Re-sagging of loose H.T/L.T line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.(work will be done inside and outside of village)
Dismantle of old/damaged ACSR weasel conductor/G.I. Wire from the existing line and its bundling and stacking in roll and send to J.E. Store/ Mathura Store.
Straightening of tilted Single pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work (inside/outside village)
M/s Maa Sharda Associates
RAJENDRA BHARDWAJ
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .