Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC | L1 | Accepted-AOC Rate is Low | |
| 2 | L2₹41.5 L+₹2.6 L (6.57%)Rejected-Finance | L2 | Rejected-Finance Rate is High | |
| 3 | Rejected-Technical 71 NORTH STREET VILLUPURAM | VILLUPURAM | TAMIL NADU | 604001 | - | Rejected-Technical Technical Not Qualified |
| Sl No | Description | Qty | Unit | S.PARVATHI L1 | VIGNESH CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Conducting Geophysical survey including conveyance of survey instrument and other labour charges | 1 | No | 1,000 ₹1,000 Lowest | 4,000 ₹4,000 |
| 2.00 | Earth workopen well excavation complying with reievant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil First depth of 2 metre including as per standard specification. Ist Depth of 2m om-2m | 127.5 | m3 | 615 ₹78,412.5 | 130 ₹16,575 Lowest |
| 3.00 | Earth workopen well excavation complying with reievant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil First depth of 2 metre including as per standard specification. IInd Depth of 2m 2m-4m | 127.5 | m3 | 812 ₹1,03,530 | 405 ₹51,637.5 Lowest |
| 4.00 | Earth workopen well excavation complying with reievant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil First depth of 2 metre including as per standard specification. IIIrd Depth of 2m | 127.5 | m3 | 975 ₹1,24,312.5 Lowest | 980 ₹1,24,950 |
| 5.00 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock not requring blasting - First depth of 2 metre including as per standard specification. IVth Depth of 2m 6m-8m | 57 | m3 | 1,200 ₹68,400 Lowest | 1,300 ₹74,100 |
| 6.00 | Vth Depth of 1m 8m-10m -5X487.98 2439.90 | 57 | m3 | 3,500 ₹1,99,500 | 2,440 ₹1,39,080 Lowest |
| 7.00 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock not requring blasting - First depth of 2 metre including as per standard specification. VIth Depth of 2m 10m-12m | 57 | m3 | 3,850 ₹2,19,450 | 2,927 ₹1,66,839 Lowest |
| 8.00 | VIIth Depth of 2m 12m-14m | 57 | m3 | 3,500 ₹1,99,500 | 3,415 ₹1,94,655 Lowest |
| 9.00 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock requring blasting - First depth of 2 metre including as per standard specification. VIIIth Depth of 2m 14m-16m | 57 | m3 | 3,500 ₹1,99,500 Lowest | 3,900 ₹2,22,300 |
| 10.00 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock requring blasting - First depth of 2 metre including as per standard specification. IXth Depth of 2m 16m-18m | 57 | m3 | 3,500 ₹1,99,500 Lowest | 4,319 ₹2,46,183 |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
13 Aug 2026, 3:00 pmClosed
EXECUTIVE OFFICER, VADAKKANANDAL TOWN PANCHAYAT
EXECUTIVE OFFICER, VADAKKANANDAL TOWN PANCHAYAT
Providing New Openwell and Motor Room with Pipeline at Ammapet in Vadakkanandal Town Panchayat
2026_DTP_692444_1
A1/451/2026-3
Open Tender
Civil Works
Works
270 days
VADAKKANANDAL TOWN PANCHAYAT
see the tender notice
3 documents required · 3 mandatory
₹0
₹50,000
27 Sept 2026
8 Aug 2026
13 Aug 2026
8 Aug 2026
13 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Conducting Geophysical survey including conveyance of survey instrument and other labour charges | 1 | No | 2 | ₹2 |
| 2 | Earth workopen well excavation complying with reievant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil First depth of 2 metre including as per standard specification. Ist Depth of 2m om-2m | 127.5 | m3 | 2 | ₹255 |
| 3 | Earth workopen well excavation complying with reievant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil First depth of 2 metre including as per standard specification. IInd Depth of 2m 2m-4m | 127.5 | m3 | 2 | ₹255 |
| 4 | Earth workopen well excavation complying with reievant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil First depth of 2 metre including as per standard specification. IIIrd Depth of 2m | 127.5 | m3 | 2 | ₹255 |
| 5 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock not requring blasting - First depth of 2 metre including as per standard specification. IVth Depth of 2m 6m-8m | 57 | m3 | 2 | ₹114 |
| 6 | Vth Depth of 1m 8m-10m -5X487.98 2439.90 | 57 | m3 | 2 | ₹114 |
| 7 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock not requring blasting - First depth of 2 metre including as per standard specification. VIth Depth of 2m 10m-12m | 57 | m3 | 2 | ₹114 |
| 8 | VIIth Depth of 2m 12m-14m | 57 | m3 | 2 | ₹114 |
| 9 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock requring blasting - First depth of 2 metre including as per standard specification. VIIIth Depth of 2m 14m-16m | 57 | m3 | 2 | ₹114 |
| 10 | Open well excavation complying with reievant clauses of T.N.D.S.S. well sinking and with lead upto 10 metre in Medium rock and dense medium rock requring blasting - First depth of 2 metre including as per standard specification. IXth Depth of 2m 16m-18m | 57 | m3 | 2 | ₹114 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.31 MB
BOQ_832570.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .