| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | ₹8.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.6 L+₹24,009.80 (2.89%)Admitted-Finance | ₹8.6 L+₹24,009.80 (2.89%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 L+₹43,886 (5.28%)Admitted-Finance | ₹8.8 L+₹43,886 (5.28%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S USHA ENTERPRISES L2 | Akash Engineering Company L3 | M/S AWAM ENGINEERING CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Overhauling of Air release valve installed on CW discharge line and Common header of unit #9 as per scope of work. | 4 | Job | 1,819 ₹7,276 | 1,862 ₹7,448 | 1,768 ₹7,072 Lowest |
| 2.00 | Primer and Painting of CW, ACW and SACW pump and their lines situated in their respective pump houses of unit #9 and all filters of SACW Pump and ACW Pump. | 602 | Sqm | 181.9 ₹1,09,503.8 | 186 ₹1,11,972 | 176.8 ₹1,06,433.6 Lowest |
| 3.00 | Cleaning of cold water basins of cooling tower unit no.09 | 1 | Job | 1,35,890 ₹1,35,890 | 1,39,065 ₹1,39,065 | 1,32,080 ₹1,32,080 Lowest |
| 4.00 | Overhauling of ACW pump of U#9 | 2 | Job | 21,999 ₹43,998 | 22,513 ₹45,026 | 21,382.4 ₹42,764.8 Lowest |
| 5.00 | Overhauling of SACW pump u#9 | 1 | Job | 12,038 ₹12,038 | 12,319 ₹12,319 | 11,700 ₹11,700 Lowest |
| 6.00 | Primer and Painting of Air receiver tank | 185 | Sqm | 182 ₹33,670 | 186 ₹34,410 | 176.8 ₹32,708 Lowest |
| 7.00 | Inspection and replacement of PVC Pipes, damaged PVC Pipes pipe & Nozzles per cell fan of cooling tower of unit #9 | 12 | Job | 12,305 ₹1,47,660 | 12,593 ₹1,51,116 | 11,960 ₹1,43,520 Lowest |
| 8.00 | Overhauling of Gear box of cooling tower of U#9 | 6 | Job | 17,762 ₹1,06,572 | 18,177 ₹1,09,062 | 17,264 ₹1,03,584 Lowest |
| 9.00 | Overhauling of drive shaft of cooling tower of U#9 | 6 | Job | 9,309 ₹55,854 | 9,527 ₹57,162 | 9,048 ₹54,288 Lowest |
| 10.00 | Overhauling of Axial flow fan of cooling tower of U#9 | 6 | Job | 11,984 ₹71,904 | 12,264 ₹73,584 | 11,648 ₹69,888 Lowest |
Tender Value
₹7.4 L
EMD Value
₹14,850
Closing Date
14 Oct 2025, 2:00 pmClosed
Superintending Engineer
OMCI D TPS HTPS Kasimpur
CAPITAL OVERHAULING OF COOLING TOWER ACW SACW AND THEIR VALVES OF UNIT NO 9 HTPS Aligarh
2025_RVUNL_1077941_1
03/OMC-I/CAMD//DTPS/2025-26
Open Tender
Repair and Maintenance Works
Item Rate
730 days
Superintending Engineer
Please refer Tender documents.
2 documents required · 2 mandatory
₹880
SAO EPAD
₹14,850
28 Oct 2025
27 Sept 2025
16 Oct 2025
27 Sept 2025
14 Oct 2025
27 Sept 2025
27 Sept 2025 - 14 Oct 2025
Amount
Overhauling of Air release valve installed on CW discharge line and Common header of unit #9 as per scope of work.
Primer and Painting of CW, ACW and SACW pump and their lines situated in their respective pump houses of unit #9 and all filters of SACW Pump and ACW Pump.
Cleaning of cold water basins of cooling tower unit no.09
Overhauling of ACW pump of U#9
Overhauling of SACW pump u#9
Primer and Painting of Air receiver tank
Inspection and replacement of PVC Pipes, damaged PVC Pipes pipe & Nozzles per cell fan of cooling tower of unit #9
Overhauling of Gear box of cooling tower of U#9
Overhauling of drive shaft of cooling tower of U#9
Overhauling of Axial flow fan of cooling tower of U#9
Cutting & Rewelding of pipe line with assembled valve after Overhauling of butterfly valves (600 mm) with gear box (both suction and discharge) (Per joint rate=1475.00x0.6/.4)=2212.00.00 (Rate of 400Nb pipe joint is Rs1475.00 taken from previous LOI No.106/AHD/C/TPS/HTPS/2023-24 Dated: 07 / 03 /2024 )
Overhauling of butterfly valves (600 mm) with gear box (both suction and discharge)
Cutting & Rewelding of pipe line with assembled valve after Overhauling of butterfly valves (450 mm) with gear box (both suction and discharge)
Overhauling of butterfly valves (450 mm) with gear box (both suction and discharge)
Cutting & Rewelding of pipe line with assembled valve after Overhauling of butterfly valves (300 mm) with gear box (both suction and discharge)
Overhauling of butterfly valves (300mm) with gear box (both suction and discharge)
Cutting & Rewelding of pipe line with assembled valve after Overhauling of butterfly valves (900 mm) with gear box (both suction and discharge) (Per joint rate=1475.00x0.9/0.4)=3318.00 (Rate of 400Nb pipe joint is Rs1475.00 taken from previous LOI No.106/AHD/C/TPS/HTPS/2023-24 Dated: 07 / 03 /2024 )
Overhauling of butterfly valves (900mm) with gear box (both suction and discharge) of ACW
M/S USHA ENTERPRISES (BID ID -5597130)
Akash Engineering Company (BID ID -5602476)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .