Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.4 LAdmitted-Finance | -0.60% | ₹10.4 L | L1 | Admitted-Finance |
| 2 | L2₹10.4 LAdmitted-Finance | -0.50% | ₹10.4 L | L2 | Admitted-Finance |
| 3 | L3₹10.4 LAdmitted-Finance | -0.40% | ₹10.4 L | L3 | Admitted-Finance |
Tender Value
₹10.5 L
EMD Value
₹1.5 L
Closing Date
9 Apr 2026, 12:00 pmClosed
EO,Nagar Panchayat Dasna
Nagar Panchayat Dasna
Nagar panchayat Dasna ke mukhiya margo par Tar bandi ka nirman karya
2026_DOLBU_1125536_1
676/NPD/15thFCUntied/etender
Open Tender
Miscellaneous Works
30 days
Dasna
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EO,Nagar Panchayat Dasna
₹1.5 L
10 Apr 2026
16 Mar 2026
9 Apr 2026
16 Mar 2026
9 Apr 2026
16 Mar 2026
Excavation for roadwork insoilwithhydraulicexcavator of 0.9cumbucketcapacity includingcuttingandloading intippers, trimmingbottomandsideslopes, inaccordance withrequirementsof lines,gradesandcross-sections,and transporting to theembankment locationwitha lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Providing concrete for plain/reinforced concreteGrade M10 (1:3:6) in open foundations complete as per drawingsand technical specificationsClause802, 803,1202 & 1203
R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in charge (cost of earth works in excavation, concrete works posts, struts, earth work and concrete to be paid for separately) : Payment to be made per metre cost of total length of barbed wire used.
R.C.C. work with Cement approved coarsesand and 2 3/4") gauge approved stoneballast in the proportions of 1:1.5:3 in lintels fodoors and windows excluding supply einforcement and its binding but including itsfixing and binding the same with 24 B.W.G.G.I., binding wire and including necessarycentering and shuttering etc. and also includingsupply of all materials, labour and T & P etc.required for proper pletion of the work.Excluding cost of Binding wire.
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.
Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge.
Add GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_2098157.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.66 MB
BOQ_2098157.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid