Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | -31.22% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 CrAdmitted-Finance | -28.33% | ₹2.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.5 CrAdmitted-Finance | -27.99% | ₹2.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.5 CrAdmitted-Finance | -27.86% | ₹2.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹3.3 CrAdmitted-Finance | -3.99% | ₹3.3 Cr | L5 | Admitted-Finance |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
6 Apr 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division Ramnagar.
Executive Engineer PWD (RandB) Division Ramnagar.
PLEASE REFER TO BOQ
2026_PWDJK_306615_1
FRESH e-NIT No. 63 of 2025-26 Dated 23-03-2026 (e-tendering) 2ND CALL
Open Tender
Civil Works
365 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹6,000
Superintending Engineer, PWD (RNB) Udhampur- Ramba
₹7.0 L
Superintending Engineer, PWD (RNB) Udhampur- Ramba
28 Apr 2026
23 Mar 2026
7 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge | ||||||
| 1.1 | All kinds of soil @70% | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 1.2 | Ordinary Rock @20% | - | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 1.3 | Hard Rock (Blasting Prohibited) @10% | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. | ||||||
| 2.1 | All kinds of soil @70% | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 2.2 | Ordinary Rock @20% | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 2.3 | Hard Rock (Blasting Prohibited) @10% | - | cum | - | - | BI01010001010000000000000515BI0100001119 |
| 3Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : | ||||||
| 3.1 | All kinds of soil @70% | - | cum | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_995486.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid